Rwanda Environment Management Authority (REMA)
Progress assessments in this report draw on six primary evidence streams, combined using a triangulation protocol designed to cross-validate quantitative indicators against institutional knowledge and primary source documentation. The six streams are: (i) structured Key Informant Interviews (KIIs) conducted via Kobo Toolbox; (ii) official government reports, annual institutional reports, and sectoral monitoring data; (iii) the Rwanda Biodiversity Information System (RBIS) and associated spatial datasets; (iv) peer-reviewed scientific literature and technical assessments; (v) international databases including the IUCN Red List, GBIF, GRIIS, GCF project database, and ABS Clearing-House; and (vi) legal instruments including gazetted laws, Official Gazette publications, and treaty ratification records.
Rwanda’s 7NR was prepared through a structured stakeholder engagement process, building on existing institutional relationships and consultative frameworks established through the NBSAP 2025–2030 development cycle. Engagement was conducted in two phases: KII surveys targeting individual institutions with direct implementation responsibilities, followed by broader consultation and validation meetings at which draft findings were reviewed by multi-stakeholder panels. KII responses were analyzed at the institution level and are attributed to the responding organization throughout this report; they are not presented as national aggregates unless independently verified through secondary sources. The stakeholder categories and institutions engaged across both phases are summarized in Table 2 below.
Table 1: Stakeholder categories and institutions engaged in 7NR preparation.
Stakeholder Category | Key Institutions / Groups Engaged |
|---|---|
Lead government agencies | REMA, MoE, RDB, RFA, RWB, RAB, MINAGRI, FONERWA |
CBD & convention focal points | CBD National Focal Point; Cartagena & Nagoya Protocol Focal Points; CITES; Ramsar; CMS |
Research and Higher Learning Institutions | CoEB/University of Rwanda (Centre of Excellence in Biodiversity and Natural Resources Management), Rwanda Institute for Conservation Agriculture (RICA), National Herbarium, University of Rwanda (College of Science and Technology), African Centre of Excellence for Internet of Things (ACEIoT/UR), Institut d’Enseignement Supérieur de Ruhengeri (INES-Ruhengeri), University of Global Health Equity (UGHE) |
Civil society & CBOs | ARECO, Nature Rwanda, RWCA, Rwanda Youth Biodiversity Network (RYBN), NUDOR, ARCOS |
Private sector | Private Sector Federation, Cleaner Production Centre, RDB Tourism |
Women's groups | National Women Council; women-led cooperatives |
International & development partners | IUCN, UNDP (BIOFIN), World Bank, African Parks, Dian Fossey Gorilla Fund, WCS, Enabel |
For each of the 22 national targets, percentage progress was calculated using the following formula:
Percentage Progress = (Current Value - Baseline) / (Target Value - Baseline) x 100
Where multiple quantitative indicators existed for a single target, an unweighted average across sub-indicators was calculated. Where quantitative baseline or target values were absent, the assessment relied on: (i) qualitative judgment informed by KII dominant ratings and documentary evidence; (ii) cross-referenced KII survey responses; and (iii) the NBSAP's own gap analysis and milestone descriptions, following the CBD Resource Manual guidance on qualitative assessment.
The traffic-light classification assigns each of the 22 national targets one of four status categories corresponding to CBD reporting conventions. The classification criteria and results are presented in the following table.
Table 2: Traffic-light classification criteria and results
Traffic-Light Status | Score Range |
|---|---|
🟢 On Track | > 75% |
🟡 Progress but Insufficient | 25-74% |
🔴 No Significant Progress | < 25% |
⚪ Insufficient Data | N/A |
The final traffic-light assignment for each target follows a documented five-step reconciliation procedure:
The indicator framework for this report draws on the full KM-GBF monitoring framework as adopted in CBD Decisions 15/5 and updated in 16/31, comprising headline, binary, component, and complementary indicators. National Rwanda-specific indicators (prefixed 'RW-') were developed for each of the 22 national targets to complement global headline indicators and capture nationally relevant dimensions of progress.
Table 3: Status of KM-GBF indicator readiness in this report
Indicator Category | No. of Indicators | Status in Rwanda |
|---|---|---|
GBF Headline indicators (Decision 16/31 Annex I) | 25 | 12 fully populated with national data; 13 classified as No data available (Annex 4) |
GBF Binary indicators (Decision 16/31 Annex III) | 15 target-level indicators (85 rows): 14 target-level (.b) + Goal B group (B.1–B.4); 71 sub-questions | All 85 rows addressed in Annex 3, covering Goal B and Targets 1, 5, 6, 8, 9, 12, 13, 14, 15, 16, 17, 20, 22, 23 |
GBF Component indicators | 33 rows across 27 distinct indicators | Selected from Decision 15/5 Annex I where Rwanda-specific data exist; reported in Annex 5 (Component and Complementary Indicators) |
GBF Complementary indicators | 36 rows across 30 distinct indicators | Selected where Rwanda-specific data exist; reported in Annex 5 (Component and Complementary Indicators) |
The mapping of Rwanda's 22 NBSAP 2025-2030 national targets against the KM-GBF's four 2050 goals and 23 global action targets was done using a goal-level narrative structure with supporting indicator tables. Per the CBD Decision 16/32 template, each goal assessment includes: (i) a summary of national progress contributing to the global goal; (ii) key national outcomes achieved; (iii) headline and binary indicator data; (iv) component and complementary indicators; and (v) key challenges and priority actions. Indicator codes follow CBD/COP/16/INF/3/Rev.1 notation: (H) = Headline indicator; (C) = Component indicator; (X) = Complementary indicator; (B) = Binary indicator. National indicators are prefixed 'RW'.
Spatial analyses and cartographic outputs were produced in Python (v3.12) using GeoPandas, Shapely, and Matplotlib. Administrative boundary data were sourced from the National Institute of Statistics of Rwanda (NISR) official WGS 1984 shapefiles (NISR, 2006), which provide the authoritative administrative delineation of Rwanda's five provinces at the highest publicly available resolution. All layers were reprojected to UTM Zone 36S (EPSG:32736) prior to rendering to ensure metric accuracy in distance and area representation.
Restoration program footprints are represented as approximate circles centered on each project's primary operational centroid, with radii calibrated to reflect reported landscape coverage areas as documented in project midterm and final reports. This representation follows standard practice for program-scale biodiversity mapping where precise parcel-level boundaries are unavailable or not publicly released by implementing agencies.
The main challenge in preparing this report was the fragmentation of biodiversity monitoring data across Rwanda's implementing institutions. Ecological monitoring, restoration data, species records, land cover data, and pollution monitoring are distributed across REMA, RDB, RFA, RWB, MINAGRI, RAB, NISR, and multiple NGO and donor-financed program management units are stored in project-managed databases that are not integrated with any national data infrastructure. This required significant effort to compile, cross-reference, and reconcile, and in several cases introduced residual uncertainty in reported figures.
The overlap problem was particularly acute for landscape restoration. At the landscape level, parcels restored under one program may intersect with areas reported by another, making a consolidated and non-overlapping national restoration total difficult to validate independently. The figure of 332,861 ha reported under T2/T8/T11 reflects the best available synthesis from available program documents, but should be treated as an approximation pending a unified spatial audit.
This fragmentation is not unique to the 7NR preparation cycle. The NBSAP 2025-2030 explicitly identifies weak data management systems and inadequate monitoring and evaluation infrastructure as implementation gaps carried forward from the 2016-2020 cycle. Addressing this structurally is a prerequisite for more reliable quantitative reporting in the 8NR and the proposed RBIS enhancement, as recommended through Recommendation R11 (a comprehensive national biodiversity monitoring framework).
A related but distinct challenge was the lack of standardized reporting periods and metric definitions across institutions. Some datasets cover fiscal years (July–June), others calendar years (January-December), and some program reports use cumulative figures from program inception rather than the 2020-2025 assessment window relevant to this report. Restoration area figures, finance disbursement totals, and species population counts were frequently reported against different baselines and time horizons, requiring manual reconciliation before inclusion. Where reconciliation was not possible with confidence, figures were either excluded or explicitly caveated. This affected, in particular, the finance mobilization data underlying T19, where the absence of a biodiversity budget tag in IFMIS means that no consistent, year-by-year biodiversity expenditure series exists.
For several national targets, and in particular T4 (threatened species extinction), T5 (sustainable wild species use), T13 (ABS), and T18 (harmful incentives), the absence of operationalized national baselines made quantitative progress calculation challenging. Rwanda does not yet have an updated national IUCN Red List, and the most recent comprehensive assessment dates to 2015, with the exception of amphibians reassessed in 2023. No monitoring system exists to track sustainable wild-species harvest rates. No monetary benefits from genetic resource utilization have been quantified under the Nagoya Protocol framework, and no formal subsidy review or harmful-incentive reform has been initiated, leaving GBF headline indicator D.2 at zero.
These are among the data gaps that the NBSAP 2025-2030 explicitly acknowledges. For nine of the 22 targets, the relevant GBF headline indicator could not be populated with national data, and proxy indicators or qualitative assessments were used instead. This limits comparability with global GBF baselines and weakens Rwanda's position in the global review process.
For a number of national targets, quantitative evidence was available not from nationally representative monitoring systems but from one or two geographically bounded programs operating under their own project-specific data collection frameworks. As a result, reported figures for ecosystem services delivery, flood protection coverage, soil erosion reduction, and NbS area coverage reflect conditions in program landscapes rather than national conditions. These figures represent the best available national estimates given current data systems, but should be interpreted with appropriate caution and not treated as uniformly applicable across all agroecological zones or administrative units. Establishing nationally representative monitoring baselines for all 22 targets, using standardized methodologies and multi-source validation, is a prerequisite for more robust quantitative reporting in the Eighth National Report and is the primary objective of Recommendation R11.
Rwanda's National Biodiversity Strategy and Action Plan 2025-2030 (NBSAP 2025-2030) was developed through an inclusive, multi-stakeholder process and formally adopted in 2024. It constitutes Rwanda's primary national policy instrument for the implementation of the Convention on Biological Diversity (CBD) for the current planning cycle and represents Rwanda's direct response to CBD Decision 15/6, which called on all Parties to revise their NBSAPs in alignment with the Kunming-Montreal Global Biodiversity Framework (KM-GBF) adopted at COP 15 in December 2022.
The NBSAP 2025-2030 establishes 22 nationally specific targets that are comprehensively mapped to the KM-GBF's four 2050 Goals (Goals A-D) and 23 global Action Targets. The NBSAP is explicitly structured around the KM-GBF architecture: Goal A targets (T1-T8) address ecosystem integrity, protected areas, species, and pollution; Goal B targets (T9-T12) cover sustainable use and ecosystem services; Goal C targets (T13) address access and benefit-sharing; and Goal D targets (T14-T22) address the means of implementation. This section presents a structured analysis of how the 22 national targets align with global targets, documents the NBSAP's treatment of targets identified as implementation gaps in the 6th National Report (2020), and highlights areas of particular alignment strength or continued challenge as assessed in the 7th National Report (2026).
The National Biodiversity Management System (NBMS) provides a comprehensive, integrated framework for systematically collecting, managing, analyzing, and applying biodiversity data, effectively bridging science and policy. By linking biodiversity monitoring with national strategies such as NBSAPs and decision-support systems, the NBMS operationalizes national commitments, enabling countries to track biodiversity status and trends, inform planning and policy processes, fulfil national and international reporting obligations, and support adaptive management in response to changing ecological and socio-economic conditions. To translate this integrated framework into practice, Rwanda's NBSAP (2025-2030) establishes a structured monitoring and evaluation (M&E) system organized around four interlinked pillars: Governance and Institutional Arrangements, Indicator Framework and Data Architecture, Reporting and Learning Cycle, and Compliance and Accountability Mechanisms, supported by enabling functions for capacity development, resource mobilization, and stakeholder engagement. Together, these pillars operationalize the NBMS logic at the national level, ensuring coherence, efficiency, and inclusivity in tracking biodiversity outcomes while maintaining the adaptive feedback loops necessary for evidence-based decision-making.
Currently under development, Rwanda's NBMS is being designed as a centralized digital platform that will consolidate biodiversity data streams from across institutions and ecosystems, providing real-time dashboards, automated indicator updates, and structured data pipelines that will directly feed into NBSAP tracking and periodic progress reviews. Once operational, it will serve as the authoritative data backbone for monitoring Rwanda's 22 national biodiversity targets, significantly enhancing the quality, comparability, and accessibility of biodiversity information for decision-makers.
Rwanda's NBSAP 2025-2030 is structured around four national strategic goals that directly mirror the KM-GBF's four 2050 Goals. This parallel architecture ensures that national planning, monitoring, and reporting are fully interoperable with the global framework.
Goal A Ecosystem Integrity & Species Recovery
National targets: T1-T8 | Goal B Sustainable Use & Ecosystem Services
National targets: T9-T12 | Goal C Access & Benefit-Sharing
National targets: T13 | Goal D Means of Implementation
National targets: T14-T22 |
The NBSAP foreword and executive summary (Ministry of Environment, 2025) explicitly commit Rwanda to 'aligning national biodiversity targets with the Kunming-Montreal Global Biodiversity Framework to ensure Rwanda's biodiversity national targets are in line with international commitments.' The NBSAP further notes that 'the revised NBSAP is founded on a strategic objective that builds on the KM-GBF vision' and that sectoral action plans in agriculture, forestry, water, tourism, fisheries, and urban development have all been developed to contribute to the 22 targets.
The table below presents the complete target-by-target alignment of Rwanda's NBSAP 2025-2030 with the KM-GBF. For each national target, the corresponding GBF Goal, Action Target(s), alignment note, and 7NR progress status are provided.
Table 1: Rwanda's 22 NBSAP 2025-2030 targets aligned with the KM-GBF
Target | National Target (Summary) | GBF Goal | GBF AT(s) | Alignment Note |
|---|---|---|---|---|
T1 | Biodiversity-inclusive spatial land-use planning - biodiversity loss close to zero | Goal A | AT1 | Direct: national spatial plans must integrate biodiversity to halt loss. KM-GBF AT1 requires biodiversity-inclusive plans covering 30% of land/sea. NLUDMP 2020-2050 and all (30) DLUPs operationalize this at national and district scale. |
T2 | Restore 10% of degraded lands and inland water | Goal A | AT2 | Full: 10% restoration aligns with KM-GBF AT2's 30x30 restoration ambition. Active programs (TREPA, Green Amayaga, VCRP, CND) cover >395,000 ha of targeted landscapes, with 332,861 ha baseline. In addition, projects such as the Gishwati-Mukura reforestation and the Nyungwe-Ruhango Corridor initiative have led to the planting of thousands of indigenous trees and the restoration of over 2,000 hectares of land. |
T3 | Conserve and effectively manage 11% of territory in protected areas | Goal A | AT3 | Direct: 11% PA target aligns with the KM-GBF 30x30 goal (Rwanda's intermediate milestone). Including OECMs, 47% of national territory falls under conservation designation. Three landmark international designations secured 2020-2023. |
T4 | Halt human-induced extinction of known threatened species | Goal A | AT4 | Full: directly mirrors KM-GBF AT4 language. Significant species recovery (gorilla, crane, lion, rhino) but GBF headline indicator A.3 (Red List Index) not computable nationally, limiting quantitative verification. |
T5 | Sustainable management and use of wild species on all managed lands | Goal A | AT5 | Full: aligns with KM-GBF AT5 (sustainable use and illegal harvesting reduction). Fish production declining; no stock assessments since 2020; no national monitoring system. Classified as Gap Target in 7NR. |
T6 | Prevent and control invasive alien species | Goal A | AT6 | Full: aligns with KM-GBF AT6. National IAS Action Plan under development; 262 GRIIS species recorded; Lantana camara covers up to 33% of Akagera NP. Gap Target carried forward from 2016-2020 NBSAP. |
T7 | Reduce pollution to levels not harmful to biodiversity | Goal A | AT7 | Full: aligns with KM-GBF AT7 (nutrient, pesticide, and plastic pollution reduction). Plastic bag ban fully enforced; organic fertilizer use 90.2%; however GBF headline indicators C.2 and C.3 not reportable nationally. Gap Target. |
T8 | Minimize climate change impacts; scale up NbS/EbA | Goal A | AT8 | Full: aligns with KM-GBF AT8. Rwanda's revised GGCRS and NDC integrate NbS/EbA. Six large-scale NbS programs operational; 41% of households protected from floods (exceeding 2030 target). |
T9 | Sustainable use of wild species; community benefits | Goal B | AT9 | Full: aligns with KM-GBF AT9 (wild species sustainable use with community benefits). TRS mechanism operational; gorilla tourism USD 200M/yr. Non-tourism wild-species benefit tracking absent. Rated No Significant Progress in 7NR. |
T10 | Sustainable agriculture, aquaculture, fisheries, and forestry | Goal B | AT10 | Full: aligns with KM-GBF AT10. Forest cover 30.4% maintained; organic fertilizer use 90.2%; aquaculture doubled. Conservation agriculture at pilot scale (150 ha vs. 22,000 ha target). |
T11 | Enhance ecosystem services and nature's contributions to people | Goal B | AT11 | Full: aligns with KM-GBF AT11. NbS programs deliver measurable services; soil loss reduced to 25 t/ha/yr in treated catchments. No national SEEA ecosystem accounts since 2023 pilot. |
T12 | Increase and improve urban green and blue spaces | Goal B | AT12 | Full: aligns with KM-GBF AT12. Green City Kigali Master Plan (600 ha) approved; Nyandungu Eco-Park (121 ha) operational; ~500 ha wetlands under rehabilitation. City Biodiversity Index under development. |
T13 | Fair and equitable ABS from genetic resources | Goal C | AT13 | Direct: aligns with KM-GBF AT13 and the Nagoya Protocol. Zero IRCCs published in ABS Clearing-House; no dedicated national ABS law enacted; no monetary benefits quantified. Gap Target. |
T14 | Mainstream biodiversity across all sectors | Goal D | AT14 | Full: aligns with KM-GBF AT14. Biodiversity integrated in Vision 2050, NST2, GGCRS, PSTA5. No cross-sectoral monitoring system to verify outcomes in practice. |
T15 | Business and financial institution biodiversity disclosure | Goal D | AT15 | Full: aligns with KM-GBF AT15. BNR Guidelines No. 040/2024 require environmental risk disclosure. No mandatory biodiversity-specific disclosure; zero companies have published nature-related reports. |
T16 | Sustainable consumption and production | Goal D | AT16 | Full: aligns with KM-GBF AT16. Plastic bag ban and National SCP Program active. Material footprint per capita not established; no food waste reduction target. Gap Target. |
T17 | Strengthen biosafety and sustainable biotechnology | Goal D | AT17 | Full: aligns with KM-GBF AT17. Biosafety Law No. 025/2024 enacted - the most significant Gap Target converted to legislative achievement in this cycle. National Biosafety Committee operational. Gap Target (now substantially addressed). |
T18 | Identify and eliminate harmful incentives; scale up positive incentives | Goal D | AT18 | Full: aligns with KM-GBF AT18. CIP fertilizer subsidy identified as harmful (BIOFIN 2025) but not yet reformed. GBF indicator D.2 value of harmful subsidies eliminated = zero. Gap Target. |
T19 | Mobilize USD 500 million for biodiversity by 2030 | Goal D | AT19 | Full: aligns with KM-GBF AT19. FONERWA mobilized approximately USD 274 million across 46 projects (not biodiversity-specific). Biodiversity finance not tagged in national budget. No progress calculable. Gap Target. |
T20 | Capacity building, technology transfer, and scientific cooperation | Goal D | AT20 | Full: aligns with KM-GBF AT20. 3,000+ participants trained (2024/25); CoEB and Nature Rwanda active. No centralized training tracking database. Gap Target. |
T21 | Biodiversity data, information, and knowledge systems | Goal D | AT21 | Full: aligns with KM-GBF AT21. RBIS operational with 2,976 species, 145,887 records; CBD-CHM functional. Institutional upload rates remain low. Gap Target. |
T22 | Inclusive participation - women, youth, persons with disabilities | Goal D | AT22 | Full: aligns with KM-GBF AT22 and AT23. 63.8% women in parliament; 11,550 women + 15,240 youth + 502 PWD engaged in conservation. No standardized biodiversity participation indicator. |
Section III of this 7NR identifies ten targets (T5, T6, T7, T13, T16, T17, T18, T19, T20, and T21) that were insufficiently progressed in the 6th National Report and remain areas of concern. Among these, T5, T13, T16, T18, and T19 are currently rated No Significant Progress in 2026, indicating that the structural conditions identified in 2020 have not yet been adequately addressed.
The NBSAP 2025-2030 responds to each Gap Target through three mechanisms: (i) provision of a strengthened or explicit baseline where none existed in the 2016-2020 NBSAP; (ii) formulation of more specific interim milestones and quantitative targets; and (iii) dedicated strategic actions and financing needs. The table below documents this treatment systematically.
Table 2: Gap Targets from 6NR implementation deficit to NBSAP 2025-2030 response and 7NR status
Target | Theme | Gap identified in 6NR / 2016-2020 NBSAP | NBSAP 2025-2030 response | 7NR Progress Status |
|---|---|---|---|---|
T5 | Sustainable use of wild species | Fish production decline; illegal harvesting unmonitored; no national system tracking sustainable-use rates for any species category. | Strengthened baseline (fish production 16,194 t, 2020). Strategic actions: fisheries legislation; aquaparks; inspections; enforcement. NBSAP financing need: included in Goal A budget. | No Significant Progress (7NR). Recommendation R4: commission fish stock assessments. |
T6 | Invasive alien species prevention and control | Only 47 IAS identified (2016 assessment); no national management plan; no early-detection system; control limited to pilot sites. | Updated baseline (262 GRIIS species, 2025); 50% reduction target in PAs; national IAS plan mandated (completion 2026). Strategic actions: surveillance; biosecurity at entry points; control programs. | Progress but Insufficient (7NR). Recommendation R5: adopt NIASAP. |
T7 | Pollution reduction | No national nutrient budget; 15% of pesticides are HHPs; water quality poor in Nyabarongo-Akagera; GBF indicators C.2 and C.3 not computable. | Concrete pollution indicators added (fertilizer efficiency, wastewater, pesticides, plastics). Strategic actions: mine drainage plan; nitrogen use efficiency research; IPM; community waste management. | Progress but Insufficient (7NR). Key gap: GBF headline indicators C.2/C.3 remain unreportable. |
T13 | Access and Benefit-Sharing (ABS) | No IRCCs; no dedicated ABS law; benefits from genetic resources not quantified; traditional knowledge undocumented. | No baseline available (stated explicitly in NBSAP Table 3). Strategic actions: strengthen legal measures; implement Nagoya Protocol; document traditional knowledge. Financing need allocated. | No Significant Progress (7NR). Recommendation R3: enact standalone ABS Law; register IRCCs before COP-17. |
T16 | Sustainable consumption and production | Material footprint not established; food waste baselines only available for 2 cities; recycling rate unmeasured. | Baselines provided (food waste: Kigali 164 kg/capita/yr; ecological footprint 0.55 gha). Strategic actions: SCP program; circular economy; waste reduction targets. | No Significant Progress (7NR). Food waste reduction target still not set as of 2026. |
T17 | Biosafety and biotechnology | Biosafety regulatory framework incomplete; GMO monitoring decentralized; accredited labs limited. | Biosafety Law No. 025/2024 enacted. National Biosafety Committee operational. Confined GMO field trials ongoing. Strategic actions: implement biosafety law; build laboratory capacity. | Progress but Insufficient (7NR). Most advanced Gap Target conversion: law enacted, framework operational. |
T18 | Harmful incentives and positive biodiversity incentives | No comprehensive subsidy inventory; no harmful subsidy reformed; GBF D.2 indicator = zero. | BIOFIN study commissioned; CIP fertilizer subsidy identified as harmful. Strategic actions: identify and eliminate harmful subsidies; scale PES mechanisms; redesign CIP subsidy. | No Significant Progress (7NR). GBF D.2 = zero. Recommendation R10: implement BIOFIN redesign recommendations. |
T19 | Biodiversity finance mobilization | No biodiversity budget line; FONERWA portfolio not tagged by theme; USD 500M target not trackable. | Consolidated financing target: USD 500M from all sources by 2030. NBSAP costing per target provided. Strategic actions: national biodiversity finance tracking; GEF/GCF mobilization. | No Significant Progress (7NR). Finance not tagged. Recommendation R2: introduce biodiversity budget tag in MINECOFIN IFMIS. |
T20 | Capacity building, technology transfer, and scientific cooperation | No baseline or consolidated metrics on capacity-building; technology transfer not systematically captured; training not centrally tracked. | Explicit acknowledgement: 'no baseline or consolidated metrics.' Strategic actions: training programs; international tech cooperation; biodiversity monitoring skills. | Progress but Insufficient (7NR). 3,000+ trained (2024/25) but no centralized database. |
T21 | Biodiversity data, information, and knowledge systems | RBIS operational but poorly populated; institutional upload rates low; interoperability limited; traditional knowledge absent from information systems. | RBIS established as the authoritative national system. Strategic actions: improve accessibility; consolidate data; ESD integration; strengthen CBD-CHM. | Progress but Insufficient (7NR). RBIS holds 145,887 records but institutional upload rates remain low. |
B.6.1 Goal A: Ecosystem Integrity and Species Recovery (T1-T8)
Rwanda's eight Goal A national targets are all directly aligned with KM-GBF Action Targets 1-8 on a one-to-one basis. The NBSAP's Goal A contribution is anchored by three flagship programs that simultaneously deliver against multiple targets: landscape restoration and NBS programs spanning six flagship initiatives, with 332,861 ha under active restoration against the NBSAP's 600,000 ha target (AT2/T2) and more than 395,000 ha of combined NBS program coverage contributing to climate resilience outcomes (AT8/T8); the protected area network and international designations (AT3/T3); and species recovery programs for mountain gorilla, grey crowned cranes, rhinos, and lions (AT4/T4).
The most significant alignment strength is in biodiversity-inclusive spatial planning (T1), where the NLUDMP 2020-2050 and 30 District Land Use Plans provide a comprehensive national framework. The most critical remaining alignment gap is the absence of Key Biodiversity Area integration in any of the 30 DLUPs (0 of 30), directly limiting Rwanda's ability to demonstrate progress on GBF headline indicator A.1. This gap is addressed in the NBSAP 2025-2030 through strategic action on KBA-inclusive spatial planning and is the subject of Recommendation R7 in Section V of this 7NR.
Three of the eight Goal A targets (T5, T6, T7) are Gap Targets. T5 (Sustainable Use of Wild Species) and T7 (Pollution) are rated No Significant Progress and Progress but Insufficient respectively in 2026, reflecting the difficulty of operationalizing monitoring systems for diffuse threats. T6 (Invasive Alien Species) remains flagged as a gap pending adoption of a National IAS Action Plan (NIASAP), expected by end-2026 (Recommendation R5). The NBSAP 2025-2030 strengthens all three with specific baselines and strategic actions absent from the 2016-2020 NBSAP.
B.6.2 Goal B: Sustainable Use and Ecosystem Services (T9-T12)
Rwanda's four Goal B targets are all fully aligned with KM-GBF Action Targets 9-12. The NBSAP's treatment of Goal B targets is among the strongest in terms of policy coherence: PSTA5 (T10), the National Aquaculture Strategy (T10), the Green City Kigali Master Plan (T12), and the GGCRS (T11) all directly operationalize the corresponding KM-GBF action targets at national scale.
Two of the four Goal B targets are rated On Track: T10 (Sustainable Agriculture, Aquaculture, Fisheries and Forestry) and T12 (Urban Green and Blue Spaces). T9 (Sustainable Wild Species Use and Community Benefits) is rated No Significant Progress, primarily due to the absence of benefit-tracking systems outside the Tourism Revenue Sharing Program. The NBSAP 2025-2030 addresses this gap through strategic actions on community-based natural resource management and wildlife enterprise development.
B.6.3 Goal C: Access and Benefit-Sharing (T13)
Rwanda's single Goal C target (T13) directly mirrors KM-GBF Action Target 13 on ABS. The NBSAP 2025-2030 explicitly acknowledges the absence of a national ABS baseline ('no baseline available, stated explicitly in NBSAP Table 3'), a condition that reflects the structural ABS governance gap: no dedicated national ABS law, no ABS permitting system, and zero IRCCs registered in the ABS Clearing-House since Nagoya Protocol ratification in 2012. This is the most critical alignment gap in Rwanda's NBSAP and is the subject of Recommendation R3 in Section V.
One positive development is the establishment of Rwanda's National Genebank (RNGB) at RAB Rubona Station, which now conserves 1,642 plant genetic resource accessions under the ITPGRFA Multilateral System, alongside 143 forage genetic resource accessions - together representing Rwanda's primary genetic resource conservation contribution. The NBSAP 2025-2030 allocates specific financing for T13 implementation and mandates enactment of dedicated ABS legislation as a primary strategic action.
B.6.4 Goal D: Means of Implementation (T14-T22)
Rwanda's nine Goal D targets (T14-T22) span the full range of KM-GBF means of implementation: policy mainstreaming (T14), business disclosure (T15), sustainable consumption (T16), biosafety (T17), incentive reform (T18), finance mobilization (T19), capacity-building (T20), data systems (T21), and inclusive governance (T22). Six of the nine Goal D targets are Gap Targets carried forward from the 2016-2020 NBSAP cycle (T16, T17, T18, T19, T20, T21).
The most significant progress is in biosafety (T17), where Biosafety Law No. 025/2024 converts this from a persistent gap into a substantive legislative achievement. The NBSAP 2025-2030 response to Goal D gap targets is generally strong in terms of target articulation and financing allocation, but weak in terms of implementation mechanisms. This is most acute for T18 (harmful incentives) and T19 (finance), where the GBF headline indicators (D.2 and the USD 500 million finance target, respectively) remain at zero or untraceable because the underlying reforms have not yet been initiated. T20 (capacity-building) presents a related but distinct gap: substantial training activity is documented (3,000+ participants trained in 2024/25 across four structured programs), but the absence of a centralized tracking database means this activity cannot be consolidated into a verifiable national indicator. These are the priority actions addressed in Recommendations R2, R8, and R10 of Section V.
Key Actions and Outcomes
Gender mainstreaming is integrated into the NBSAP 2025-2030 with specific provisions for women, youth and persons with disabilities. Community engagement is mandatory in Environmental and Social Impact Assessments under Law N° 48/2018 on Environment, and compliance is approximately 100% for screened projects. The TRS program gives priority to women's cooperatives and youth groups in community project selection. Nature Rwanda reported that five of six community groups at restoration sites are led by women and youth. The Rwanda Youth Biodiversity Network (RYBN) was established by MoE and REMA. RWB-implemented conservation initiatives engaged 11,550 women, 10,150 men, 15,240 youth, and 502 persons with disabilities. Women hold 63.8% of parliamentary seats, providing a strong enabling environment for gender-responsive policy.
Progress Assessment and Rating
(i) Gender mainstreaming policies in place - 100%; (ii) disaggregated participation data - partial, 50%; (iii) biodiversity-specific participation indicators - absent, 0%; (iv) traditional knowledge integration - minimal, 10%. Average ~40%. KII: mixed 'Insufficient' and 'On Track'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.1.1: Inclusive biodiversity governance and participation | ||
ESIA public consultation compliance | ~100% | REMA EIA database, 2025 |
Disaggregated biodiversity participation data | Partial - project-level only | REMA, 2025b |
| Gender and Inclusive Engagement | ||
Women engaged in conservation initiatives | 11,550 | RWB |
Youth engaged in conservation initiatives | 15,240 | RWB |
Persons with disabilities engaged | 502 | RWB |
Community restoration groups led by women/youth | 5 of 6 groups | Nature Rwanda / COMBIO, 2025 |
Women in national parliament | 63.8% | Parliament of Rwanda, 2024 |
| Traditional Knowledge | ||
Traditional knowledge documented in RBIS | Not yet incorporated | CoEB, 2026b |
Challenges and Data Gaps
Biodiversity-specific participation indicators are weakly standardized. Participation data are fragmented across projects and NGOs, with no central reporting framework for inclusive biodiversity governance. Traditional knowledge holders are not systematically engaged in formal planning processes.
no data
RWB-led conservation initiatives engaging 11,550 women, 15,240 youth, and 502 persons with disabilities, the Rwanda Youth Biodiversity Network (RYBN), and women holding 63.8% of parliamentary seats collectively advance SDG 5.5 (ensuring women's full and effective participation in political, economic and public life), SDG 10.2 (empowering and promoting social, economic and political inclusion of all), and SDG 16.7 (ensuring responsive, inclusive, participatory and representative decision-making). Priority targeting of women's cooperatives and youth groups in the Tourism Revenue Sharing Program also contributes to SDG 1.4 by ensuring equal access to economic resources.
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Partially implemented: 11,550 women; 15,240 youth; 502 PWD engaged
Partially to fully: NBSAP 2025-2030 gender-mainstreamed; 63.8% women in parliament
Key Actions and Outcomes
The Rwanda Biodiversity Information System (RBIS), developed by CoEB and REMA with GEF support, is an open-source, web-based platform aggregating species occurrence data, ecosystem maps and monitoring records. RBIS now holds 2,976 recorded species (2024-2025), including 127 endemic and 89 threatened species. Two datasets have been published on the Global Biodiversity Information Facility (GBIF). The CBD Clearing-House Mechanism (CHM) for Rwanda is functional and linked to RBIS. Species inventories completed during the reporting period include the Mukura Forest Reserve biodiversity survey, the remnant forests of Eastern Province baseline inventory, and aquatic biodiversity assessments of the Akagera watershed. Education for Sustainable Development (ESD) is mainstreamed in national curricula at primary and secondary levels.
Progress Assessment and Rating
(i) RBIS operational - 100%; (ii) data comprehensiveness (2,976 species) - partial, 60%; (iii) institutional upload rates - low, 20%; (iv) interoperability - weak, 20%. Average ~50%. KII: 'Insufficient'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.4: Biodiversity monitoring data accessibility | ||
RBIS status | Operational (rbis.gov.rw) | CoEB, 2026b |
Total species recorded in RBIS | 2,976 (2024-2025) | CoEB, 2026b |
RBIS occurrence records | 145,887 | RBIS / CoEB/UR, 2025 |
Endemic species | 127 | CoEB, 2026b |
Threatened species | 89 | CoEB, 2026b |
Institutional data upload rate to RBIS | Low - significant gaps remain | CoEB, 2026b |
| Global Data Sharing | ||
GBIF datasets published | 2 (pollinators; aquatic macroinvertebrates; bats) | GBIF.org, 2025; Flanders et al., 2022 |
CBD CHM status | Functional and linked to RBIS | CHM Rwanda portal, 2025 |
| Education for Sustainable Development | ||
ESD curriculum integration | Integrated at P/S level; teacher education and assessments | REB / MoE, 2025 |
Challenges and Data Gaps
Many institutions do not routinely upload monitoring data to RBIS, resulting in significant gaps in species occurrence records, ecosystem condition data and long-term monitoring series. Interoperability between RBIS and forestry, agriculture and water resources information systems is weak.
no data
The Rwanda Biodiversity Information System (RBIS, 2,976 species recorded), publication of two datasets on GBIF, the functional CBD Clearing-House Mechanism, and integration of ESD into national curricula at primary and secondary level advance SDG 17.18 (capacity-building for developing countries to increase availability of high-quality, timely and reliable data) and SDG 17.19 (developing progress measurements beyond GDP). Open data sharing also contributes to SDG 4.7 by improving environmental literacy and SDG 15.9 by making biodiversity values visible in national planning.
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
RBIS operational; CHM-CBD operational; 2 GBIF datasets
Key Actions and Outcomes
The Centre of Excellence in Biodiversity and Natural Resources Management (CoEB) at the University of Rwanda has produced multiple peer-reviewed publications, supported MSc students in biodiversity monitoring, and trained community members on biodiversity assessment and climate-smart agriculture. Nature Rwanda runs four structured capacity-building programs - Internship, Green Camp, Awareness and Ecoclub - reaching 2,920 individuals directly and over 30,000 through awareness campaigns. RICA offers degree programs in conservation agriculture. International cooperation has advanced through partnerships with GEO BON, GBIF, ICIPE and various research networks. In total, more than 3,000 participants were trained in biodiversity monitoring and conservation in 2024/25, and 175 environmental practitioners were trained on biodiversity-inclusive EIA. Over 1,200 farmers were trained in biodiversity and agroecological practices in 2025.
Progress Assessment and Rating
(i) Structured programs (4) - good; (ii) 3,000+ participants trained - good; (iii) centralized tracking - absent, 0%; (iv) technology adoption metrics - not tracked, 0%. Average ~50%. KII: mixed 'Insufficient' and 'On Track'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.3: Capacity-building and technology transfer - national tracking absent | ||
Centralized training tracking database | Not in place | - |
| Training and Awareness | ||
Structured capacity-building programs | 4 (Internship, Green Camp, Awareness, Ecoclub) | Nature Rwanda, 2025 |
Participants trained (biodiversity, 2024/25) | 3,000+ | CoEB / Nature Rwanda, 2025 |
EIA practitioners trained on biodiversity | 175 | BIOFIN Rwanda, 2024a |
Farmers trained in biodiversity practices (2024/26) | 1,200+ | CoEB publications list by 2026 |
| Scientific Outputs and Digital Infrastructure | ||
Peer-reviewed publications (2020-2026) | 5+ (CoEB, Nature Rwanda, ICIPE/RAB) | CoEB publications list by 2026 |
National Herbarium digital portal; RBIS | Operational | CoEB NHR and RBIS online portals 2026 |
| International Cooperation | ||
DeSIRA Project (UGent/KU Leuven/UR) | MSc and PhD students trained; GoR-aligned research | IUCN KII, 2026 |
Challenges and Data Gaps
Rwanda lacks a centralized database to track training outputs, technology adoption or research outcomes across institutions. Mechanisms for absorbing and diffusing international technology transfers remain weak. The cumulative biodiversity impact of capacity-building investments cannot be assessed.
no data
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Key Actions and Outcomes
The NBSAP 2025-2030 establishes a national target of mobilizing USD 500 million for biodiversity by 2030. FONERWA, as the primary national financing mechanism, has mobilized over USD 274 million since 2012 across 46 projects, covering climate and environment broadly. The National Climate and Nature Finance Strategy (2024-2030) launched by MINECOFIN in October 2024 provides a framework for aligning financial flows with biodiversity objectives. Ireme Invest provides concessional credit at 12% versus a market rate of approximately 18%. The critical challenge is that biodiversity-specific expenditure is not tagged in the national budget or FONERWA portfolio, making it impossible to calculate progress towards the USD 500 million target.
Progress Assessment and Rating
NBSAP target: USD 500 million by 2030. FONERWA total: USD 274 million (not biodiversity-specific). Without a tagging system, percentage progress cannot be reliably calculated. KII: 'Insufficient' or 'Not Applicable'. Classification driven by the absence of a tracking system rather than evidence of no spending.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicators D.1 (International funding) and D.2 (Domestic funding) - not disaggregated for biodiversity | ||
GBF D.1 - international public funding for biodiversity | Not consolidated separately | Republic of Rwanda, 2024a,b |
GBF D.2 - domestic public funding for biodiversity | Integrated in environment budgets; not separately tagged | Republic of Rwanda, 2024a,b |
| Finance Mobilization | ||
NBSAP biodiversity finance target | USD 500 million by 2030 | Republic of Rwanda, 2025a |
FONERWA total mobilization (2012-2024) | USD 274+ million (not biodiversity-specific) | Green Climate Fund, 2024 |
| Innovative Finance Instruments | ||
Ireme Invest concessional credit rate | 12% | BRD, 2025 |
IremboPay environmental fines | USD 130,000+ (Oct 2024-May 2025) | BIOFIN / REMA, 2025 |
| Monitoring Gaps | ||
National biodiversity finance tagging system | Not in place | BIOFIN Rwanda, 2025b |
Challenges and Data Gaps
No integrated national biodiversity finance tracking system exists. Biodiversity expenditure is not distinctly tagged in the national budget. Without a biodiversity tagging system, percentage progress towards the USD 500 million target cannot be reliably measured.
No data
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Key Actions and Outcomes
BIOFIN conducted a national biodiversity financing landscape analysis (2018-2020) and a national biodiversity financing assessment (2021). The BIOFIN policy brief 'Redesigning Rwanda's Crop Intensification Program (CIP) Subsidy Scheme for Biodiversity and Equity' (2025) identified the CIP fertilizer subsidy for rice as harmful to wetland biodiversity. On the positive incentives side, the Tourism Revenue Sharing Program (TRSP) allocates 10% of pooled national park entrance fees to communities in Park Adjacent Administrative Zones, and in the 2023/2024 cycle, TRS funded 105 community projects at a total value of RWF 3.27 billion (approximately USD 2.3 million) (RDB, 2024). Total tourism sector revenue reached USD 647 million in 2024, driven in part by a 27% increase in gorilla tourism revenue (RDB, 2024). Environmental fees and fines collected through IremboPay reached USD 130,000+ since October 2024 (IremboPay/REMA, 2025). However, no harmful subsidy has yet been eliminated or reformed as a result of these assessments.
Progress Assessment and Rating
(i) Harmful subsidy identification completed - 50%; (ii) elimination or reform of any subsidy - none, 0%; (iii) scaling positive incentives (TRS, FONERWA) - 50%. Average ~33%. Headline indicator D.2 (harmful subsidies eliminated): zero.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.2: Value of harmful incentives eliminated (current value: zero) | ||
GBF D.2 indicator - value of harmful subsidies eliminated | Zero | BIOFIN, 2025b |
Harmful fertilizer subsidy (CIP/rice) | RWF 54.2 billion (identified but not yet reformed) | BIOFIN Rwanda, 2025a |
| Harmful Subsidy Assessment | ||
Harmful subsidy identification studies | Completed (CIP subsidy identified) | BIOFIN Rwanda, 2025a |
| Positive Incentives | ||
TRS community distributions (since inception) | RWF 3.27 billion | RDB, 2024 |
IremboPay environmental fines | USD 130,000+ (Oct 2024-May 2025) | BIOFIN Rwanda, 2025b |
| Instruments Under Development | ||
PES framework status | Under development | REMA, 2025b |
Challenges and Data Gaps
No consolidated national inventory of biodiversity-harmful subsidies exists beyond the BIOFIN pilot study. Subsidy reform remains in the assessment phase. Biodiversity-relevant private sector incentives are not tracked.
No data
BIOFIN's identification of the CIP fertilizer subsidy for rice (RWF 54.2 billion) as harmful to wetland biodiversity, and the scaling of positive incentives through the Tourism Revenue Sharing Program (RWF 3.27 billion in 2023/24) and IremboPay environmental fines (USD 130,000+), contribute to SDG 12.c (rationalizing inefficient fossil-fuel subsidies - by analogy, subsidies harmful to nature) and SDG 15 (halting biodiversity loss). Aligning financial flows with biodiversity objectives also advances SDG 8.4 by improving resource efficiency and reducing the environmental cost of economic growth.
[u1]Does this harmful subsides identified?
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Key Actions and Outcomes
Biosafety Law No. 025/2024 of 16/02/2024 was enacted, establishing a comprehensive regulatory framework for GMOs and living modified organisms (LMOs) covering risk assessment, approval, monitoring and enforcement. This represents the most significant biosafety advance since the 6th National Report. The National Biosafety Committee (comprising REMA, RAB, RBC, RFDA and academic representatives) is established and operational. Institutional Biosafety Committees have been formed at RAB, the University of Rwanda and RICA. Confined field trials for GMO cassava and potato varieties are ongoing. REMA hosted a week-long expert workshop in 2025 on advanced biosafety topics including genome editing and stacked genes.
Progress Assessment and Rating
(i) Biosafety law enacted - 100%; (ii) operational monitoring system - partial, 40%; (iii) trained personnel - not consolidated, 30%; (iv) accredited laboratories - limited, 20%. Average ~48%. KII: 'Insufficient'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.1.4: Biosafety regulatory compliance | ||
National biosafety law | Law No. 025/2024 of 16/02/2024 enacted | Official Gazette, 2024 |
National Biosafety Committee | Established and operational | REMA, 2024 |
GMO monitoring system | Not yet fully operational | Republic of Rwanda, 2025a |
Accredited biosafety laboratories | Limited in number | REMA, 2025b |
| Research and Field Trials | ||
GMO field trials | Confined trials only (cassava, potato) | RAB, 2024 |
| Genetic Resources Conservation | ||
Plant genetic resources - RNGB | 1,642 (2023) | RAB, 2024 |
Forage genetic resources | 143 (2023) | RAB, 2024 |
Challenges and Data Gaps
Monitoring and reporting systems are decentralized; national-level tracking of biosafety outcomes is not formally instituted. Capacity for GMO risk assessment and detection is limited. The GMO monitoring system is not yet fully operational.
No data
Rwanda's enactment of Biosafety Law No. 025/2024, establishment of the National Biosafety Committee, and ongoing GMO confined field trials for cassava and potato contribute to SDG 2.5 (maintaining genetic diversity of seeds, cultivated plants and farmed animals) and SDG 9.5 (enhancing scientific research and upgrading the technological capabilities of industrial sectors, including by encouraging innovation). Rigorous risk assessment of LMOs also advances SDG 3 by preventing unintended health risks from biotechnology products.
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Key Actions and Outcomes
Rwanda has enacted strong foundational SCP legislation. The plastic carrier bag ban (Law No. 57/2008, strengthened by Law No. 57/2018) is fully enforced nationwide. The National Circular Economy Action Plan was launched in 2022, with a total implementation cost of USD 211.2 million to 2035. Its stated objective explicitly includes halting biodiversity loss alongside waste reduction and emissions cuts. The City of Kigali's Solid Waste Management Strategy has achieved approximately 90% household waste collection coverage. Food waste baselines have been established by UNEP for Rwanda (164 kg/capita/year). Despite the strong policy framework, measurable progress towards sustainable consumption patterns has not been demonstrated. Material footprint per capita has not been established as a national indicator. No national reduction target for food waste has been set. The Sustainable Public Procurement (SPP) Policy Framework was approved by Cabinet on 18 October 2024 (RPPA), aligned with ISO 20400. Green Public Procurement Guidelines target four priority sectors (ICT equipment, beverages, printing services, building/construction).
Progress Assessment and Rating
(i) SCP policies in place, 0%; (ii)National Circular Economy Action Plan, 100% (iii) measurable reduction in material footprint - no baseline, 0%; (iv) food waste - baseline established but no reduction target, 30%; (v) recycling rate - not measured, 0%. Average ~26%. KII: 'No Progress' or 'Insufficient Data' dominant.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.1.3: Material footprint per capita - not yet established nationally | ||
Material footprint per capita | Not established | - |
Ecological footprint per capita | 0.55 global hectares | Global Footprint Network, 2022 |
| Waste and Circular Economy | ||
Plastic bag ban enforcement | Fully enforced nationwide | Law No. 57/2018; REMA, 2020a |
Urban solid waste collection (Kigali) | Around 90% | City of Kigali, 2024 |
National recycling rate | Not consolidated | - |
| Food Waste | ||
Food waste - Rwanda | 164 kg/capita/year | UNEP, 2024a |
National food waste reduction target | Not set | REMA, 2025b |
Challenges and Data Gaps
No harmonized national dataset exists for material footprint, recycling rate, or circular economy adoption. The absence of a dedicated national SCP strategy means that existing actions such as the plastic bag ban, the Circular Economy Action Plan (MoE/UNEP, 2022), and solid waste management initiatives remain fragmented across sectors without a unifying policy framework linking consumption patterns to biodiversity outcomes.
No data
Rwanda's plastic bag ban (fully enforced nationwide), the National Circular Economy Action Plan (2022, USD 211.2 million to 2035), ~90% urban solid waste collection in Kigali, and the Sustainable Public Procurement Policy Framework approved in October 2024 collectively advance SDG 12.1 (implementation of the 10-Year Framework of Programs on sustainable consumption and production), SDG 12.3 (halving global food waste), and SDG 12.5 (substantially reducing waste generation through prevention, reduction, recycling and reuse). Reducing material flows and waste loads in urban ecosystems also contributes to SDG 11.6 (reducing adverse environmental impacts of cities).
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Key Actions and Outcomes
The National Bank of Rwanda (BNR) issued two instruments advancing environmental disclosure: Guidelines No. 040/2024 of 25/11/2024 on the disclosure and reporting of sustainability-related financial information, and Guidelines No. 2600/2023 on climate-related and environmental financial risk management. These require financial institutions to assess and disclose environmental risks, including biodiversity where material. BIOFIN conducted a landscape analysis of nature-related financial disclosures in Rwanda and published the policy brief 'Rwanda's Journey Toward Nature-Related Financial Disclosures', assessing alignment with the TNFD framework. Despite these advances, no company operating in Rwanda has yet published a biodiversity-specific risk report, and mandatory biodiversity disclosure requirements have not yet been enacted.
Progress Assessment and Rating
Progress Assessment and Rating
(i) Disclosure guidelines exist - 100%; (ii) companies actually disclosing - very few, 5%; (iii) mandatory requirements - absent, 0%. Average ~35%. KII: 'Insufficient' or ‘Not Applicable’.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.1.2: Business biodiversity disclosure | ||
Companies disclosing biodiversity risks | Not tracked - no national registry | BIOFIN, 2025b |
Companies with biodiversity-specific reports | 0 identified | BIOFIN, 2024b |
| Regulatory and Policy Framework | ||
BNR sustainability disclosure guidelines | Guidelines No. 040/2024 (25/11/2024) | BNR, 2024 |
BNR climate/environmental risk guidelines | Guidelines No. 2600/2023 | BNR, 2023 |
Mandatory biodiversity disclosure requirement | Not yet enacted | BNR, 2023 |
| Assessment and Alignment | ||
TNFD-aligned reporting assessment | Completed (BIOFIN policy brief, 2024) | BIOFIN, 2024b |
Challenges and Data Gaps
Biodiversity-specific corporate disclosure is at an early stage. No centralized tracking system exists; reporting is voluntary and inconsistent. SMEs are not engaged. Mandatory requirements are not yet enacted.
No data
The National Bank of Rwanda's sustainability disclosure guidelines (Guidelines No. 040/2024 and No. 2600/2023) and BIOFIN's TNFD-alignment assessment contribute to SDG 12.6 (encourage companies to adopt sustainable practices and integrate sustainability information into their reporting cycles) and SDG 17.17 (encouraging effective public, public-private, and civil society partnerships). Embedding environmental risk management in Rwanda's financial sector also advances SDG 8.4 (improving global resource efficiency in consumption and production) by influencing capital allocation toward biodiversity-positive investments.
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Key Actions and Outcomes
Biodiversity considerations have been integrated into Rwanda's principal national development frameworks: Vision 2050 (approved 2020) and the National Strategy for Transformation 2 (NST2, 2024-2029) both include environment and natural resources as explicit crosscutting pillars. Sector strategies across agriculture (PSTA 5), forestry, water, tourism and infrastructure all contain biodiversity provisions. The Law on Biological Diversity (Law No. 064/2021) mandates the integration of biodiversity into all sectoral policies and environmental impact assessments. EIA guidelines have been revised to include biodiversity screening, with 149 EIA experts and 63 biodiversity actors trained on the updated guidelines. SEEA natural capital accounts were developed in pilot form by NISR with World Bank support (2023). However, mainstreaming remains largely aspirational. Cross-sectoral collaboration is project-based rather than institutionalized. Private sector biodiversity integration is weak, and no standardized system tracks whether biodiversity objectives in sector plans are being achieved.
Progress Assessment and Rating
(i) High-level policy integration (Vision 2050, NST2) - 100%; (ii) sectoral biodiversity action plans - partial, 50%; (iii) monitoring of mainstreaming effectiveness - absent, 0%; (iv) EIA practitioners trained - positive but limited. Average ~50%. Despite strong policy frameworks, the monitoring framework to demonstrate outcome impact is absent. KII: 'Not Applicable' or 'Insufficient' dominant.
Related SDGs: SDG 13, SDG 15, SDG 16, SDG 17
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator D.1: Integration of biodiversity values in policies, regulations and national accounts | ||
EIA compliance with biodiversity screening | High for major projects (screening-level) | REMA EIA database, 2025 |
EIA practitioners trained on biodiversity | 149 EIA experts + 63 biodiversity actors | BIOFIN Rwanda, 2024a |
SEEA natural capital accounts | Pilot completed (2023) | NISR, 2023 |
| Policy Integration | ||
Representation of biodiversity in policies | Vision 2050, NST2, NBSAP, all major sector strategies clearly integrate biodiversity | Vision 2050 (2020); NBSAP (2025) |
| Monitoring Gaps | ||
Cross-sector biodiversity monitoring system | Not in place | - |
GBF D.1-D.3 biodiversity finance tracking | Not disaggregated | - |
Challenges and Data Gaps
No standardized national system tracks biodiversity-related financing and policy integration effectiveness across all sectors. Private sector mainstreaming is weak, and no central registry of corporate biodiversity commitments exists.
No data
Integration of biodiversity into Rwanda's Vision 2050, NST2 (2024-2029), PSTA 5, Law N° 064/2021 on Biological Diversity, and EIA guidelines contributes to SDG 15.9 (integrating ecosystem and biodiversity values into national and local planning and poverty reduction strategies) and SDG 17.14 (enhancing policy coherence for sustainable development). Ongoing SEEA pilot work by NISR also advances SDG 17.19 (developing measurements of progress on sustainable development that complement GDP).
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Biodiversity considerations have been integrated into Rwanda's principal national development frameworks: Vision 2050 (approved 2020) and the National Strategy for Transformation 2 (NST2, 2024-2029) both include environment and natural resources as explicit crosscutting pillars. Sector strategies across agriculture (PSTA 5), forestry, water, tourism, and infrastructure all contain biodiversity provisions. The Law on Biological Diversity (Law No. 064/2021) mandates the integration of biodiversity into all sectoral policies and environmental impact assessments. EIA guidelines have been revised to include biodiversity screening, with 149 EIA experts and 63 biodiversity actors trained on the updated guidelines. SEEA natural capital accounts were developed in pilot form by NISR with World Bank support (2023). However, mainstreaming remains aspirational. Cross-sectoral collaboration is project-based rather than institutionalized. Private sector biodiversity integration is weak, and no standardized system tracks whether biodiversity objectives in sector plans are being achieved.
Key Actions and Outcomes
The Green City Kigali Master Plan for the 600-hectare Kinyinya Hill area was approved in September 2024. It mandates that 20-25% of built-up area be designated as public green and blue space, requiring green building standards and the integration of native plant species in urban landscaping. A US$28 million GCF grant for Green City Kigali implementation was approved in 2024. The NLUDMP 2020-2050 sets a national standard requiring all cities and urban developments to allocate at least 20-25% of area to green space by 2050. The Nyandungu Urban Wetland Eco-Park (121 ha) was completed by REMA and has become a flagship example of urban biodiversity and NbS integration, providing wetland ecosystem services, recreational space and over 4,000 green jobs. Five additional Kigali wetlands are under active rehabilitation, covering approximately 500 ha in total.
Progress Assessment and Rating
(i) Green City Kigali master plan approved - 100%; (ii) Nyandungu 121 ha + 500 ha ongoing wetlands - exceeds initial targets; (iii) CBI under development - 50%; (iv) urban green space ~15-20% vs. 20-25% target. Average ~83%. KII dominant rating: 'On Track'.
Indicator / Outcomes | Value / Status | Source |
|---|---|---|
| GBF Headline Indicator 12.1: Average share of built-up area as green/blue space | ||
Urban green space - Kigali (proxy) | ~15-20% of built-up area | City of Kigali, 2023-2025 estimate |
NLUDMP green space standard | 20-25% by 2050 (all urban developments) | REMA, 2023b |
| Urban NbS Investments | ||
Green City Kigali Master Plan | 600 ha approved (Sept 2024); mandates 20-25% green/blue space | Green Climate Fund, 2024b |
GCF grant for Green City Kigali | US$28 million (approved 2024) | MoE Rwanda, 2024 |
Nyandungu Urban Wetland Eco-Park | 121 ha; 4,000+ green jobs | REMA, 2025b |
Additional Kigali wetlands under restoration | ~500 ha (5 sites) | REMA, 2025b |
| Monitoring Framework | ||
City Biodiversity Index (CBI) | Under development (not yet operational) | Republic of Rwanda, 2025a |
Challenges and Data Gaps
No harmonized national framework currently measures urban green and blue space across all cities. Data are Kigali-centric; secondary cities have limited baseline information. The City Biodiversity Index is still under development.
No data
The Green City Kigali Master Plan (600 ha, mandating 20-25% green and blue space), the Nyandungu Urban Wetland Eco-Park (121 ha), and rehabilitation of five Kigali wetlands (~500 ha) directly advance SDG 11.7 (universal access to safe, inclusive and accessible green and public spaces) and SDG 3.4 (promotion of mental health and well-being). By incorporating native species and biodiversity-friendly design standards into urban planning, T12 also contributes to SDG 15.5 (preventing loss of biodiversity) and SDG 13 (building urban climate resilience through heat island reduction and flood regulation).
Key Actions and Outcomes
Rwanda ratified the Nagoya Protocol on Access and Benefit-Sharing on 20 March 2012. The ABS Guideline and Toolkit was published by REMA in 2019 in partnership with UNDP. Law N° 064/2021 of 14/10/2021 governing biological diversity provides the domestic legal basis for ABS regulation in Rwanda. RAB manages the Rwanda National Genebank (RNGB) at Rubona Station, conserving plant, animal and microbial genetic resources. Plant genetic resources conserved: 1,642 (2023 baseline); forage genetic resources conserved: 143 (2023). Despite this legal and institutional framework, no internationally recognized certificates of compliance (IRCCs) have been published in the ABS Clearing-House. No monetary benefits from genetic resource utilization have been systematically quantified.
Progress Assessment and Rating
(i) ABS legal framework in place - 100%; (ii) benefit-sharing tracking system - absent, 0%; (iii) ABS permits consolidated - not consolidated, 0%; (iv) traditional knowledge documentation - minimal, 10%. Average ~28%. KII dominant rating: 'Not Applicable' or 'Insufficient Data'.
Related SDGs: SDG 2, SDG 15, SDG 17
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicators C.1 (IRCCs) and C.2 (Monetary benefits) - both at zero | ||
IRCCs published in ABS Clearing-House | 0 | ABS Clearing-House, 2026 |
Monetary benefits from ABS | Not systematically quantified | - |
Non-monetary benefits | Qualitative only (ecotourism, conservation) | REMA, 2025 |
| Legal and Policy Framework | ||
Nagoya Protocol ratification | Ratified 9 October 2012 (Law No. 24/2012) | ABS Clearing-House, 2012 |
| Genetic Resources Conservation (Rwanda National Genebank) | ||
Plant genetic resources - RNGB | 1,642 (2023 baseline) | RAB Annual Report 2024 |
Forage genetic resources - RNGB | 143 (2023) | RAB Annual Report 2024 |
| Traditional Knowledge | ||
Traditional knowledge documentation | Largely undocumented | - |
Challenges and Data Gaps
Benefit-sharing conditions are not systematically recorded when genetic resource export permits are issued. Traditional knowledge remains largely undocumented and unprotected. No IRCCs have been published in the ABS Clearing-House despite Nagoya Protocol ratification in 2012.
No data
Rwanda's ABS legal framework (Law N° 064/2021), Nagoya Protocol ratification (2012), and conservation of 1,642 plant genetic resource accessions at the Rwanda National Genebank contribute to SDG 15.6 (promote fair and equitable sharing of benefits arising from the utilization of genetic resources), SDG 2.5 (maintaining genetic diversity of seeds, cultivated plants and farmed animals), and SDG 17.6 (global partnerships for technology transfer and knowledge sharing). Closing the gap between the legal framework and operational benefit-sharing (zero IRCCs currently published) is critical to advancing these SDG targets.
Key Actions and Outcomes
Six large-scale NbS landscape programs are operational and delivering measurable ecosystem service benefits: TREPA, Green Amayaga, VCRP, CND, FIP Agroforestry, and five Kigali wetlands rehabilitation. The Nyandungu Urban Wetland Eco-Park (121 ha) is a flagship urban NbS achievement, providing water quality improvement, flood regulation, biodiversity habitat, recreational services and over 4,000 green jobs. Annual soil loss in high-risk areas has been reduced from an estimated 150 t/ha/yr to 25 t/ha/yr on treated catchments assessed across 1,080,168 ha in 2022. Monetary ecosystem service valuation studies are available but outdated. Nyungwe NP was valued at USD 4.8 billion (REMA, 2020b); Rugezi Wetland at USD 374 million total economic value (REMA, 2020b); the Mukura landscape at USD 1,443/year (ARCOS, 2014); the Akagera Wetland Complex at USD 1.1 billion stock value and USD 11.9 million annual flow value for carbon storage (REMA, 2019); and Kigali wetlands at more than USD 74.2 million/year in provisioning services (ARCOS, 2021a,b). No national-scale ecosystem accounts have been finalized since the Rwanda Natural Capital Accounts for Ecosystems (NISR/MINECOFIN/World Bank WAVES Partnership, 2019), though SEEA capacity-building with NISR is ongoing under EU technical assistance (SquareX/NTU International, 2024).
Progress Assessment and Rating
(i) Ecosystem service valuation - partial, outdated; (ii) soil loss reduction in treated catchments - achieved; (iii) water quality monitoring coverage - partial, 40%; (iv) air quality monitoring - established but not national, 50%. Average ~48%. KII dominant rating: 'Insufficient'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator B.5: Ecosystem services contributions to people - proxy indicators used | ||
Annual soil loss (treated catchments, 2022) | 25 t/ha/yr (reduced from ~150 t/ha/yr) | RWB, 2025a |
Area assessed for soil erosion | 1,080,168 ha (2022) | REMA, 2023a |
| Urban NbS Outcomes | ||
Nyandungu Eco-Park (urban NbS) | 121 ha; 4,000+ green jobs | REMA, 2025b |
| Ecosystem Service Valuations | ||
Nyungwe NP ecosystem valuation | USD 4.8 billion (2020) | REMA, 2020b |
Rugezi wetland total economic value | USD 374 million (2014) | REMA, 2020b |
| Mukura landscape | USD 1,443 per year (2014) | ARCOS, 2014 |
Akagera Wetland Complex stock value (carbon Storage) | USD 1.1 billion (2019) | REMA, 2019 |
| Akagera Wetland Complex annual flow value | USD 11.9 million (2019) | REMA, 2019 |
| Kigali wetlands annual ecosystem services value | More than USD 74.2 million/year provisioning | ARCOS, 2021a,b |
| Monitoring Gaps | ||
National ecosystem services account | Not produced since SEEA pilot (2023) | NISR / World Bank, 2023b |
Challenges and Data Gaps
No national-scale monetization of ecosystem services for all ecosystems. Although water and air quality data are collected, they are not synthesized into national indicators, and Rwanda lacks an integrated NCP framework linking ecosystem condition to human well-being.
No data
Rwanda's NbS portfolio - delivering outcomes including a reduction in annual soil loss from 150 t/ha/yr to 25 t/ha/yr on treated catchments, the Nyandungu Urban Wetland Eco-Park (121 ha, 4,000+ green jobs), and ecosystem service valuations of Nyungwe NP (USD 4.8 billion) and Kigali wetlands (USD 74.2+ million/year) - contributes to SDG 11.6 (reducing adverse environmental impacts of cities), SDG 6.6 (protecting water-related ecosystems), and SDG 13 (building climate resilience). Piloting SEEA ecosystem accounts also advances SDG 15.9 on integrating ecosystem values into national accounting and planning.
No national ecosystem-services index produced. Site-level valuations: Nyungwe NP USD 4.8 billion (2020); Rugezi wetland USD 374 million (2014); Mukura landscape USD 1,443/yr (2014); Akagera Wetland Complex — carbon stock USD 1.1 billion / annual flow USD 11.9 million (2019); Kigali wetlands >USD 74.2 million/year provisioning (ARCOS, 2021a,b). SEEA pilot completed 2023 (World Bank/NISR) but no national SEEA-EA synthesis published.
Key Actions and Outcomes
The 5th Strategic Plan for Agriculture Transformation (PSTA 5) mainstreams biodiversity and promotes conservation agriculture as a priority practice. The Eastern Province Forest Landscape Restoration Strategy (2024-2030) was published by RFA. Forest Law Nº 046/2024 of 04/06/2024 provides the legal basis for sustainable forest management, while FSC certification has been achieved for Nyungwe NP buffer zone forestry operations. The National Aquaculture Strategy for Rwanda (2023–2035) targets 80,000 t/year of aquaculture production by 2035 (baseline: ~4,900 t/year) (MINAGRI, 2023); total national fish production (capture and aquaculture combined) reached 52,439 t in 2025 (MINAGRI, 2026, Nyandwi, 2026). Forest cover has been maintained at 30.4% (724,695 ha). This figure remains the most recent official Rwandan government forest cover figure, and no updated national assessment has been published to replace it. Rwanda's national forest cover definition includes plantations, wooded savannah, and shrubs in addition to natural closed-canopy forest. Conservation agriculture remains at pilot scale (150 ha reported nationally), well below the 22,000 ha PSTA 5 target.
Progress Assessment and Rating
(i) Forest cover maintained >30% (achieved, 100%); (ii) organic fertilizer use 90% (strongly positive); (iii) aquaculture growth (60% increase); (iv) conservation agriculture 150 ha vs. 22,000 ha target (pilot stage only). Average ~70%. KII dominant rating: 'On Track'.
Indicator / Outcomes | Value / Status | Source |
|---|---|---|
| GBF Headline Indicator B.2: Sustainable forest management | ||
Forest cover | 724,695 ha / 30.4% | RFA, 2024 |
NBSAP forest cover target | Maintain >=30% | Republic of Rwanda, 2025a |
FSC-certified forest operations | Nyungwe NP buffer zone | RFA, 2024 |
| GBF Headline Indicator B.3: Sustainable agriculture area | ||
Organic fertilizer use | 90.2% of farmers (Season A 2026) | MINAGRI, 2024 |
National land under agriculture | 76.3% | NISR, 2024 |
Conservation agriculture (reported) | 150 ha (PSTA 5 target: 22,000 ha by 2028/29) | MINAGRI, 2025 |
| Aquaculture and Fisheries | ||
Aquaculture target (National Aquaculture Strategy 2023–2035) | 80,000 t/year by 2035 | MINAGRI, 2023 |
Total national fish production (capture + aquaculture) | ~60% increase (32,756 t in 2020 → 52,439 t in 2025) | MINAGRI, 2026; Nyandwi, 2026 |
| Livelihoods | ||
Avg. income, small-scale food producers | RWF 609,257 avg. total income/household | TREPA Annual Household Survey, 2025 |
Challenges and Data Gaps
No unified national framework links agriculture, forestry, fisheries and soil health into a single sustainability index. Conservation agriculture remains at pilot scale (150 ha vs. 22,000 ha PSTA 5 target) and requires rapid scale-up.
No data
Rwanda's PSTA 5 (mainstreaming biodiversity in agriculture), Forest Law No 046/2024, FSC certification in Nyungwe buffer zone, and the National Aquaculture Strategy (targeting 80,000 t/year by 2035) jointly advance SDG 2.3 (doubling agricultural productivity of small-scale food producers), SDG 2.4 (sustainable food production systems), and SDG 12.2 (sustainable management of natural resources). Maintaining forest cover at 30.4% (724,695 ha) contributes to SDG 15.2 (sustainable management of all types of forests) and SDG 6.6 (protecting water-related ecosystems).
Key Actions and Outcomes
The Tourism Revenue Sharing Program (TRSP) allocates 10% of pooled national park entrance fees to communities in Park Adjacent Administrative Zones. In the 2023/2024 cycle, TRS funded 105 community projects at a total value of RWF 3.27 billion (approximately USD 2.3 million). Total tourism sector revenue reached USD 647 million in 2024, driven in part by a 27% increase in gorilla tourism revenue.
Gorilla conservation programs remain Rwanda's most internationally recognized contribution to wild species management and community benefit generation. The annual Kwita Izina gorilla naming ceremony serves as both a conservation communication mechanism and a platform for mobilizing national and international support for mountain gorilla protection. Rwanda's Volcanoes National Park hosts approximately 250-260 of the estimated global mountain gorilla population of over 1,000 individuals.
A Human-Wildlife Conflict (HWC) compensation scheme is operational around Akagera National Park, administered by the Akagera Management Company in partnership with RDB and African Parks. HWC compensation mechanisms are not yet systematically operational around Nyungwe and Volcanoes National Parks, where baboon and primate crop-raiding remain unresolved concerns. No national system tracks community benefits from wild species outside the TRS program.
Progress Assessment and Rating
Proxy: (i) TRS mechanism operational (100%); (ii) coverage beyond tourism very limited (10%); (iii) non-monetary benefit monitoring absent (0%). Average ~37% but concentrated in a narrow sector. KII dominant rating: 'Not Applicable' or 'Insufficient Data'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator B.1: Benefits from protected areas (tourism revenue sharing) | ||
x community benefit (2024) | RWF 3.27 billion / ~USD 2.3 million (105 projects) | RDB, 2024 |
Total tourism revenue (2024) | USD 647 million | RDB, 2024 |
Gorilla tourism revenue growth (2024) | +27% year-on-year; ~USD 200 million | RDB, 2024 |
Employment (wildlife-based tourism) | ~160,000 direct/indirect jobs | RDB, 2024 (estimate) |
| Community Enterprise Benefits | ||
Akagera honey production (2024) | 13 t / ~USD 60,000 (660 beekeepers) | African Parks, 2024b |
Akagera fish harvest (COPECO cooperative, 2024) | 130 t / ~USD 121,837 | African Parks, 2024b |
HWC compensation scheme (Akagera NP) | Operational; >80% reduction in incidents post-fencing (2013) | African Parks, 2021 |
| Conservation Instruments Under Development | ||
Chimpanzee Conservation Action Plan | Under development | RDB |
Rwanda Wildlife Conservation Bond | Under development | RDB |
| Monitoring Gaps | ||
Benefits from wild species beyond TRS | No national tracking system | REMA, 2025b |
HWC compensation coverage (Nyungwe & Volcanoes NP) | Not systematically operational | NBSAP 2025-2030 |
Challenges and Data Gaps
No national system tracks community benefits from wild species outside the TRS program. Valuation of ecosystem-based livelihoods beyond tourism is not advanced. Benefit distribution data disaggregated by gender, age or disability are not collected.
No data
Rwanda's Tourism Revenue Sharing Program (TRSP), which distributed RWF 3.27 billion to 105 community projects in 2023/24, and the wildlife-based tourism sector generating USD 647 million in 2024, contribute to SDG 8.9 (sustainable tourism that creates jobs and promotes local culture and products) and SDG 1.4 (ensuring equal rights to economic resources for the poor). Gorilla conservation in Volcanoes NP - generating approximately USD 200 million in annual gorilla tourism revenue - demonstrates how sustainable wildlife use can directly contribute to SDG 12.2 (sustainable use of natural resources).
Key Actions and Outcomes
Rwanda has made substantial investments in landscape-scale ecosystem restoration since 2020 through several flagship programs, including TREPA, the Green Amayaga Project, VCRP, COMBIO, and the Congo-Nile Divide (CND), FIP Agroforestry and Kigali Wetlands Restoration projects. As of 2024, a national baseline of 332,861 hectares of degraded land is under active restoration across these initiatives (RWB, 2025; REMA, 2025), against a national target of 600,000 ha by 2029 under the Climate, Environment and Natural Resources Sector Strategic Plan (2024–2029).
The TREPA project (2021-2027, GCF USD 33.7 million, USD 15.8 million co-financing) targets 60,000 ha in Eastern Province. Its 2025 midterm report confirmed 73% of the restoration target achieved (43,777 ha), and reaching about 246,000 direct beneficiaries (IUCN, 2025b). The Green Amayaga Project (LDCF III, USD 32.7 million) targets a 263,000 ha landscape; Phase I restored over 35,500 ha, including 1,400 ha of forest plantations and 405 ha of hilltop forests replanted with indigenous trees (UNDP Rwanda, 2025a). The Volcanoes Community Resilience Project (VCRP, World Bank USD 50 million IDA + USD 12 million PROGREEN) targets catchment restoration around Volcanoes National Park (World Bank, 2023a). The Congo-Nile Divide Restoration Project (GCF FP217, USD 39 million, 2023-2029) aims to restore and sustainably manage approximately 250,000 ha of landscape across the Congo-Nile Divide (GCF, 2023). The FIP-PRODAR Project (AfDB, 2022-2027) targets 60,000 ha across eight districts in Rwanda's Southern and Northern Provinces, integrating agroforestry, landscape restoration, and sustainable value chain development implemented by the Rwanda Forestry Authority (MoE, 2022). The Kigali Five Wetlands Rehabilitation Project (GEF/World Bank RUDPII/NDF, USD 80 million total) is rehabilitating approximately 500 ha of urban wetlands across five sites, Gikondo, Nyabugogo, Kibumba, Rwampara, and Rugenge-Rwintare, with 94% completion achieved by June 2026, projected to benefit over 220,000 residents and generate 7,500 jobs (World Bank, 2026).
NGO contributions have been substantial. ARCOS engaged 80,000 households and planted over 11.5 million perennial trees across approximately 49,915 ha, of which 41 species are indigenous (ARCOS, KII 2026). Nature Rwanda planted 865,725 trees across 2,825 ha and created 521 conservation sites (Nature Rwanda, 2025). Wilderness Bisate has planted over 120,000 indigenous trees on its concession adjacent to Volcanoes National Park since 2017 (Wilderness Destinations, 2026). Prime Minister's Order N° 001/03 of 30/01/2024 designated 35 swamplands (~2,000 ha) as strictly protected.
Progress Assessment and Rating
Restoration area: 332,861+ ha under programs against target of 600,000 ha (55% progress). KII dominant rating: mixed 'On Track' for actions, 'Insufficient' for data quality.
Indicator / Outcomes | Value / Status | Source |
|---|---|---|
| GBF Headline Indicator H2.2: Area of degraded ecosystems under restoration | ||
Baseline area under restoration (2024) | 332,861 ha | Republic of Rwanda, 2025a |
Forest cover | 724,695 ha / 30.4% | RFA, 2023 |
Project level Restoration Coverage |
|
|
Green Amayaga Project (LDCF III) - landscape target | 263,000 ha | UNDP Rwanda, 2025a |
Green Amayaga Phase I – area restored | 35,500+ ha (incl. 1,400 ha forest plantations; 405 ha hilltop forest with indigenous trees) | UNDP Rwanda, 2025a |
RWB cumulative restored area (FY 2024/25) | 228,161 ha (cumulative, not incremental) | RWB, 2025a |
TREPA project - target area (2021-2027) | 60,000 ha | IUCN, 2025 |
TREPA restored area - 2025 | 43,777 ha | IUCN, 2025 |
| Supporting Indicators | ||
Strictly protected swamplands (PM Order) | 35 sites / ~2,000 ha | PM Order N° 001/03 of 30/01/2024 |
Challenges and Data Gaps
No single national degraded-ecosystem baseline exists, making it impossible to calculate the '10% restored' NBSAP target against a single authoritative denominator. Different projects use different methodologies and reported areas overlap. Institutional data sharing between RFA, RWB, REMA and NGOs remains fragmented.
No data
Rwanda's large-scale ecosystem restoration programs - including TREPA, Green Amayaga, VCRP, the Congo-Nile Divide Project, and Kigali wetlands rehabilitation - directly advance SDG 15.1 (conservation and sustainable use of terrestrial and freshwater ecosystems), SDG 15.3 (land-degradation neutrality), and SDG 6.6 (protection and restoration of water-related ecosystems). By restoring 332,861 ha of degraded landscape, T2 also contributes to SDG 13.1, building resilience and adaptive capacity to climate-related hazards, given that restored ecosystems regulate water flows and reduce flood and landslide risk.
Key Actions and Outcomes
Since 2020, Rwanda has embedded biodiversity considerations into its national spatial planning framework through a series of legally mandated instruments. The foundation is the National Land Use and Development Master Plan (NLUDMP) 2020-2050, approved by Cabinet on 29 July 2020 and gazetted under Presidential Order N° 038/01 of 20/05/2022. REMA conducted a Strategic Environmental Assessment in collaboration with the Global Green Growth Institute and the National Land Authority under Ministerial Order N° 002 of 08/02/2021.
The NLUDMP is operationalized at the subnational level through District Land Use Plans (DLUPs) for all 30 districts of Rwanda, within which Local Detailed Physical Plans are prepared through participatory zoning that incorporates green and blue infrastructural components. None of the 30 DLUPs currently integrate Key Biodiversity Areas (KBAs), which is the most critical outstanding gap against this target.
The EIA system has been revised to mainstream biodiversity more systematically into development decisions. EIA guidelines have been updated to include a biodiversity dimension, and training was provided to 149 EIA experts and 63 biodiversity actors. Under the VCRP and CND projects, a total of 120 Village Land Use Action Plans (VLUAPs) have been completed. The Green City Kigali initiative developed a Master Plan for the 600-hectare Kinyinya Hill area, approved in September 2024.
Progress Assessment and Rating
No quantitative target value was set for T1. Qualitative assessment: (i) all 30 districts have DLUPs but none integrates KBAs; (ii) 120 VLUAPs completed at village level; (iii) EIA biodiversity mainstreaming partial; (iv) Green City Kigali Master Plan approved. KII dominant rating: 'Insufficient'.
Related SDGs: SDG 11, SDG 15
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator A.1: Area of spatial plans integrating biodiversity | ||
National Land Use & Development Master Plan (NLUDMP 2020-2050) | 1 covering all districts | Republic of Rwanda (2020a) |
DLUPs operationalizing NLUDMP | 30 of 30 districts | Presidential Order N° 038/01 of 20/05/2022 |
DLUPs with explicit KBA zoning | 0 of 30 | - |
VLUAPs completed (VCRP + CND) | 120 | RWB, 2025a |
EIA experts trained on biodiversity guidelines | 149 EIA experts + 63 biodiversity actors | BIOFIN Rwanda, 2024a |
| GBF Headline Indicator C.5: Urban green space - national data under development | ||
Green City Kigali Master Plan | 600 ha approved | Green Climate Fund, 2024b |
| NBSAP Financing | ||
NBSAP financing need (spatial planning) | USD 97.5-107.7 million (2019-2030) | MINECOFIN (2024) |
Challenges and Data Gaps
The most significant challenge is the absence of a consolidated, geospatially explicit baseline of ecosystem distribution and condition at district level. Geospatial biodiversity data layers are not fully integrated across REMA, RFA, NLA and RDB. Systematic post-approval monitoring of biodiversity conditions in EIA processes remains limited. Capacity and funding to update spatial biodiversity data at district scale are insufficient.
No data
Rwanda's biodiversity-inclusive spatial planning — including the NLUDMP 2020–2050, 30 District Land Use Plans, and 120 Village Land Use Action Plans — directly advances SDG 11.3 (inclusive, sustainable urbanization and participatory settlement planning) and SDG 11.a (support for positive economic, social and environmental links between urban, peri-urban and rural areas). By mandating biodiversity screening in Environmental Impact Assessments and integrating green and blue infrastructure into district plans, T1 also contributes to SDG 15.9, which calls for the integration of ecosystem and biodiversity values into national and local planning and development processes.
Key Actions and Outcomes
Rwanda has developed a comprehensive NbS-for-climate-resilience investment portfolio. The revised Green Growth and Climate Resilience Strategy (GGCRS) integrates NbS as a core pillar with an estimated annual investment need of USD 2 billion (MoE, 2023). GCF projects approved between 2021 and 2024 include: TREPA (USD 33.7 million + USD 15.8 million co-financing); Ireme Invest additional tranche (USD 42.8 million via AfDB); and the Congo-Nile Divide (FP217, USD 39.1 million). The National Climate and Nature Finance Strategy (2024-2030) was launched in October 2024. The Updated NDC integrates NbS across the Land Use and Forestry and Water sectors. Six large-scale NbS programs are under implementation: TREPA, Green Amayaga, VCRP, CND, FIP Agroforestry, and five Kigali wetlands. The proportion of households protected from floods increased from 9% to 41% by 2026, exceeding the NBSAP interim target of 40% by 2030. FONERWA mobilized USD 274+ million across 46 projects since 2012.
Progress Assessment and Rating
Flood protection: 41% vs. 40% target = exceeded. NbS integration into climate strategies: 100%. Aboveground biomass monitoring: not updated, 0%. Average ~75%. However, KII dominant rating 'Insufficient' due to limited biodiversity-specific outcome tracking.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator C.1: Climate-related disaster risk reduction (flood protection coverage) | ||
Households protected from floods | 41% (2026) - exceeds 2030 target of 40% | RWB, 2026 |
| NbS Program Coverage and Investment | ||
Catchment restoration area | 332,861 ha (2023/24 baseline); target 550,000 ha by 2030 | RWB Annual Report 2024/25 |
NbS program coverage | More than 395,000 ha across 6 programs | REMA/RFA/RWB, 2025A |
GCF grants for NbS (2021-2024) | USD 80+ million approved | GCF project database, 2024 |
FONERWA total mobilization (2012-2024) | USD 274+ million (climate + environment) | FONERWA Annual Report 2024 |
| Climate and Carbon Indicators | ||
Carbon Registry | Operational (2024) | MoE Rwanda, 2024 |
TREPA GHG mitigation (2023-2025) | 13,286,469 tCO2e | TREPA Project records (IUCN) |
| Subnational Implementation | ||
Local govts adopting DRR strategies (Eastern Province) | 7 Districts | Eastern Province district records (IUCN) |
Challenges and Data Gaps
No unified national system links ecosystem services to climate resilience outcomes. The biodiversity-specific impact of NbS programs (as distinct from carbon outcomes) is not systematically tracked. NbS projects are concentrated in specific districts, and coverage across all 30 districts remains uneven.
Target 8 is Rwanda's primary mechanism for integrating biodiversity conservation with climate action, directly advancing SDG 13.1 (strengthening resilience and adaptive capacity to climate-related hazards) and SDG 13.2 (integrating climate change measures into national policies, strategies, and planning). The six large-scale NbS programs (TREPA, Green Amayaga, VCRP, CND, FIP Agroforestry, and Kigali wetlands) and FONERWA's USD 274+ million portfolio collectively advance SDG 15.1 by maintaining ecosystem integrity while also reducing disaster risk and improving water security relevant to SDG 6 and SDG 1.
No national ecosystem-services index produced. Site-level valuations: Nyungwe NP USD 4.8 billion (2020); Rugezi wetland USD 374 million (2014); Mukura landscape USD 1,443/yr (2014); Akagera Wetland Complex — carbon stock USD 1.1 billion / annual flow USD 11.9 million (2019); Kigali wetlands >USD 74.2 million/year provisioning (ARCOS, 2021a,b). SEEA pilot completed 2023 (World Bank/NISR) but no national SEEA-EA synthesis published.
Key Actions and Outcomes
Rwanda's plastic carrier bag ban (Law N° 17/2019 of 10/08/2019) is fully enforced. Rwanda co-authored UNEA Resolution 5/14 launching negotiations for a binding global plastics treaty and co-chairs the High Ambition Coalition to End Plastic Pollution. On nutrient management, the 5th Strategic Plan for Agriculture Transformation (PSTA 5) targets 8.5 million tons of organic fertilizers by 2024/25 and 15.2 million tons by 2029. Organic fertilizer use has reached 90.2% of farmers (Season A 2026), while inorganic fertilizer use stands at 67.2%. Rwanda's 2023 National Survey on Chemicals and Hazardous Wastes (REMA, 2023c) identified 472.3 tons of expired fertilizers, pesticides and biocides awaiting disposal across RAB stations and partner warehouses nationwide. Obsolete POP pesticide stocks, including 3,028 kg of Lindane and Endosulfan at the deteriorating Nyanza-Kicukiro interim storage site and a corroding 200-litre drum of Methamidophos at RAB Rubungo Station remain inadequately managed. No national PFAS management framework exists, and 70% of consulted institutions had no awareness of PFAS and 100% lacked testing or treatment capacity. On plastic pollution, 584.3 tons of single-use PET waste were collected between Q2 2022 and Q1 2023 under a REMA–Enviroserve initiative. Studies of the Nyabarongo River found water quality index scores of 'poor' during long rains with ion concentrations exceeding WHO standards. Bioassessment of the Nyabarongo and Akagera Rivers yielded a TARISS score of 44.53 +/- 2.69, indicating moderate impairment (Nsengimana et al., 2025b). Air quality is monitored through 12 ambient stations in Kigali; PM2.5 readings average 33.6-46.3 ug/m3 annual average (2021-2024). Urban solid waste collection covers approximately 90% of Kigali households (Omodieke et al., 2026).
Progress Assessment and Rating
Proxy indicators: (i) organic fertilizer use 90.2% (positive); (ii) expired and obsolete chemicals (fertilizers, pesticides, biocides) 0%; (iii) water quality - no improvement documented, 0%; (iv) urban waste collection ~90% (positive). Average ~57% but ranked “Progresss but Insufficient” to key health related risks persistent. KII dominant rating: 'Insufficient'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicators C.2 (Nutrient Index) and C.3 (Pesticide Risk Index) - no national data available | ||
GBF Indicators C.2 and C.3 (Nutrient/Pesticide Index) | No national data available | REMA, 2025 |
| Nutrient Management | ||
Organic fertilizer use by farmers | 90.2% (Season A 2026) | MINAGRI/RAB, 2026 |
Inorganic fertilizer use | 67.2% (Season A 2026) | MINAGRI/RAB, 2026 |
National NPK use | 103,722 t (2023) | MINAGRI, 2024 |
| Pesticide and Chemical Risk | ||
Expired fertilizers, pesticides and biocides awaiting disposal | 472.3 t | REMA, 2023c |
Obsolete POP pesticide stocks | 3,028 Kg Lindane and Endosulfan ; 200-liter drum of Methamidophos | REMA, 2023c |
PFAS management framework | None exists | REMA, 2023c |
| Water Quality | ||
Nyabarongo water quality index | 'Poor' during long rains; exceeds WHO standards | Niampradit et al., 2024 |
River bioassessment (TARISS score) | 44.53 +/- 2.69 (moderate impairment) | Nsengimana et al., 2025b |
| Waste and Urban Pollution | ||
PM2.5 (Kigali) | 33.6-46.3 ug/m3 annual average (2021-2024) | Omodieke et al., 2026 |
Urban solid waste collection (Kigali) | ~90% | City of Kigali Annual Report, 2024 |
Food waste - Rwanda | 164 kg/capita/year | UNEP Food Waste Index Report 2024 |
Challenges and Data Gaps
The primary challenge is the absence of a national pollution monitoring system for the biodiversity-relevant GBF T7 indicators: no nutrient loading database, no pesticide-risk index and no consolidated water quality dataset covering all major catchments. Pesticides disposal is persistent, there’s lack of PFAS. Industrial pollution from artisanal and small-scale mining is inadequately inventoried.
No data
Rwanda's plastic bag ban (fully enforced nationwide), efforts to reduce hazardous chemical waste (472.3 t of expired fertilizers and pesticides identified for disposal), and co-authorship of UNEA Resolution 5/14 launching global plastics treaty negotiations all contribute to SDG 12.4 (environmentally sound management of chemicals and all wastes), SDG 6.3 (improving water quality by reducing pollution), and SDG 3.9 (reducing deaths and illnesses from hazardous chemicals and air, water, and soil pollution). Monitoring of Nyabarongo River water quality and urban air quality in Kigali also informs progress toward SDG 14.1 as applied to inland waters.
No national ecosystem-services index produced. Site-level valuations: Nyungwe NP USD 4.8 billion (2020); Rugezi wetland USD 374 million (2014); Mukura landscape USD 1,443/yr (2014); Akagera Wetland Complex — carbon stock USD 1.1 billion / annual flow USD 11.9 million (2019); Kigali wetlands >USD 74.2 million/year provisioning (ARCOS, 2021a,b). SEEA pilot completed 2023 (World Bank/NISR) but no national SEEA-EA synthesis published.
Key Actions and Outcomes
An updated national estimate for 2024-2025 records 243 introduced or invasive alien species, while the GRIIS database lists 262 species records for Rwanda. In Gishwati-Mukura NP, the COMBIO project identified and eradicated invasive trees from a 15-ha pilot for Assisted Natural Regeneration. RWB led community-based removal of invasive aquatic weeds from Lake Kivu. A 2025 peer-reviewed study modelled Lantana camara distribution in Akagera NP at 30-m resolution, finding that up to 33% of the park represents potential habitat for this invasive species. REMA, RDB and RFA are jointly developing a national IAS management plan under NBSAP 2025-2030, expected for completion in 2026.
Progress Assessment and Rating
Qualitative: (i) IAS management initiated in select PAs (75%); (ii) national plan in development (40%); (iii) no documented reduction in establishment rate (0%). Average ~38%. KII dominant rating: mixed 'Insufficient' and 'No Progress'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator C.4: National IAS establishment rate | ||
National IAS establishment rate | No national baseline established | REMA, 2025 |
| IAS Inventory and Database | ||
GRIIS species records for Rwanda | 262 (2020 reference) | GRIIS, 2020 |
| Site-Level IAS Control Actions | ||
Area under active IAS control | 15 ha (Gishwati-Mukura) + ongoing Akagera and Lake Kivu | COMBIO / African Parks / RWB, 2023-2025 |
National IAS management plan | In development (completion expected 2026) | REMA/RDB/RFA, 2025 |
| Research and Modeling | ||
L. camara potential habitat (Akagera NP) | Up to 33% of 1,122 km2 | Schell et al., 2025 |
Challenges and Data Gaps
The 2016 national IAS inventory is now nearly a decade old. Rwanda lacks a systematic early-detection and rapid-response system for new IAS introductions. Data are not integrated across different institutions/organizations. No reduction in IAS establishment rate has been documented.
No data
Rwanda's IAS management - including Lantana camara control in Akagera NP and assisted natural regeneration in Gishwati-Mukura - directly advances SDG 15.8 (prevention of introduction and significant reduction of impact of invasive alien species on land and water ecosystems). Controlling aquatic invasives in inland water bodies also supports SDG 14.1 (prevent and significantly reduce marine pollution of all kinds), here applied to freshwater ecosystems, and SDG 2.5 by maintaining ecosystem functions underpinning food production.
No national ecosystem-services index produced. Site-level valuations: Nyungwe NP USD 4.8 billion (2020); Rugezi wetland USD 374 million (2014); Mukura landscape USD 1,443/yr (2014); Akagera Wetland Complex — carbon stock USD 1.1 billion / annual flow USD 11.9 million (2019); Kigali wetlands >USD 74.2 million/year provisioning (ARCOS, 2021a,b). SEEA pilot completed 2023 (World Bank/NISR) but no national SEEA-EA synthesis published.
Key Actions and Outcomes
Several legal instruments have been enacted to strengthen the framework for sustainable wild-species use. Law N° 001/2023 of 13/01/2023 governing national parks and nature reserves strengthened legal controls on wild-species harvest in and around PAs. Fisheries management is governed by Ministerial Order Nº 001/11.30 of 11/12/2020, and RAB conducts fisheries inspections and enforces the annual biological break (August-October, Lake Kivu). Forest Law Nº 046/2024 of 04/06/2024 provides the legal basis for sustainable forest management. Fish production in Lake Kivu declined from 24,199 tons in 2017/18 to 16,194 tons in 2019/20, attributed primarily to illegal fishing (RAB/AUDA-NEPAD). National total fish production has since recovered steadily, rising from 32,756 tons in 2020 to 52,439 tons in 2024/25 (MINAGRI, 2026, Nyandwi, 2026).
Progress Assessment and Rating
Proxy indicators: (i) fish stock trend: increasing, 75%; (ii) illegal harvesting: persistent, 0%; (iii) sustainable use monitoring system: absent, 0%; (iv) other agriculture and forestry-based wild species, 0%. Average ~19%. KII dominant rating: 'No Progress' or 'Insufficient Data'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator B.4.1: Sustainable harvest of wild species | ||
Fish stocks within sustainable levels | Cannot be calculated - no stock assessment since 2020 | RAB, 2025 |
| Supporting Indicators: Wild Species Use Trends | ||
Fish production - Lake Kivu | 52,439 t (2026) | MINAGRI, 2026; Nyandwi, 2026 |
| Enforcement and Monitoring Systems | ||
Snare removals (Nyungwe NP, since 2016) | 13,000+ (indicator of illegal harvest pressure) | African Parks, 2024a |
National monitoring system for sustainable use | Absent | REMA / RDB, 2025 |
Environmental fines (IremboPay, Oct 2024-May 2025) | US$130,000 | BIOFIN, 2025b |
Challenges and Data Gaps
No national baseline on illegal harvesting rates exists for any wild species category. Enforcement data are fragmented across forestry, fisheries and wildlife sectors with no centralized reporting system. Absence of data on other agriculture and forestry-based wild species.
No data
Sustainable wild-species use - including regulated lake fisheries, forestry inspections, and anti-poaching enforcement - contributes to SDG 12.2 (sustainable management and efficient use of natural resources) and SDG 15.7 (end poaching and trafficking of protected species of flora and fauna). Recovery of total national fish production from 32,756 t (2020) to 52,439 t (2025) through sustainable fisheries management also advances SDG 14.4 (by 2020, effectively regulate harvesting and end overfishing) and provides food and income security relevant to SDG 1.4 and SDG 8.9.
No national ecosystem-services index produced. Site-level valuations: Nyungwe NP USD 4.8 billion (2020); Rugezi wetland USD 374 million (2014); Mukura landscape USD 1,443/yr (2014); Akagera Wetland Complex — carbon stock USD 1.1 billion / annual flow USD 11.9 million (2019); Kigali wetlands >USD 74.2 million/year provisioning (ARCOS, 2021a,b). SEEA pilot completed 2023 (World Bank/NISR) but no national SEEA-EA synthesis published.
Key Actions and Outcomes
Significant species recovery achievements have been recorded for several flagship taxa across the country. In Volcanoes National Park, intensive transboundary protection and community monitoring have supported the continued growth of the Endangered mountain gorilla population, which has officially crossed 1,100 individuals across the region (Apes Reporting Project, 2025). In the savannahs of Akagera National Park, ecosystem restoration has yielded historic apex predator and megafauna returns. Lions, which were reintroduced with a founder population of seven in 2015, have successfully expanded to 62 animals through natural reproduction. Furthermore, African Parks reintroduced 30 Southern White Rhinos to Akagera NP in 2021 and 70 more in June 2025, bringing that total to over 100. Bird conservation has mirrored these triumphs; the Rwanda Wildlife Conservation Association (RWCA) removed 242 cranes from illegal captivity and reintroduced 166 to Akagera NP (Ruhagazi, et.al., 2025). Finally, in the montane rainforest of Nyungwe NP, the Critically Endangered Hill's horseshoe bat (Rhinolophus hilli), unseen for 40 years, was successfully rediscovered in 2022 (Flanders, et.al., 2022).
Scientific research underpinning species conservation has advanced significantly after 2020, including aquatic biodiversity assessments of the Akagera watershed, the Mukura Forest Reserve biodiversity survey, a baseline inventory of remnant forests in Eastern Province, and small mammals of Nyungwe National Park. The Special Guarantee Fund (SGF), established under Law N° 52/2011 to compensate victims of damages caused by wild animals in protected areas, compensating over 1,097 claims totaling Rwf 194.6 million in Eastern Province between July 2025 and April 2026 (AllAfrica, 2026).The RBIS now records 2,976 species, of which 89 are threatened and 127 are endemic.
Progress Assessment and Rating
Composite: (i) national Red List Index - absent, 0%; (ii) proportion of threatened species with improving status ~30%; (iii) HWC management systems in place - partial, 50%. Average ~27%. KII dominant rating: ‘Insufficient’.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicators A.3 (Red List Index) and A.4 (Effective population size) | ||
National IUCN Red List Index (GBF A.3) | Outdated, except for Amphibians | REMA, 2015; CoEB, 2026b; Dehling and Sinsch, 2023 |
Effective population size (GBF A.4) | Not assessed nationally | - |
| National Biodiversity Information (RBIS) | ||
Total species recorded in RBIS | 2,976 (2024-2025) | CoEB, 2026b |
Threatened species | 89 | CoEB, 2026b |
Endemic species | 127 | CoEB, 2026b |
| Flagship Species Recovery | ||
Mountain gorilla population (global) | More than 1,000 | Apes Reporting Project, 2025 |
Grey crowned crane population | ~1,300 (+330% in ten years) | RWCA, 2025 |
Southern White Rhino (Akagera) | 100+ | African Parks, 2025 |
Lion population (Akagera) | 62+ | African Parks, 2025 |
Hill's horseshoe bat (Rhinolophus hilli) — rediscovery | Rediscovered in Nyungwe NP in 2022 after 40-year absence; Critically Endangered | Flanders et al., 2022 |
Grey crowned cranes removed from illegal captivity | 242 | Ruhagazi et al., 2025 |
Grey crowned cranes reintroduced to Akagera NP | 166 | Ruhagazi et al., 2025 |
| Human-Wildlife Conflict and Enforcement | ||
HWC incidents (annual) | Gishwati 208; Mukura 185; Mutara/Akagera 108 | Sun et al., 2025 |
Snares removed (Nyungwe, since 2016) | 13,000+ | African Parks, 2024a |
Challenges and Data Gaps
The absence of an updated national Red List and Red List Index means the 'halt extinction' mandate cannot be verified quantitatively. Species trend data are available only for a handful of charismatic megafauna. HWC data are not consolidated at national level. Genetic diversity (GBF A.4) has not been assessed for any wild species.
No data
Species recovery achievements under T4 - including mountain gorilla population growth, lion and white rhino reintroduction in Akagera NP, grey crowned crane recovery, and rediscovery of the critically endangered Hill's horseshoe bat - contribute directly to SDG 15.5 (urgent action to reduce the degradation of natural habitats, halt the loss of biodiversity, and protect and prevent the extinction of threatened species) and SDG 15.7 (end poaching and trafficking of protected species). These successes also demonstrate viable pathways for global SDG 14.4 compliance by showing that effective management can reverse species decline.
Key Actions and Outcomes
Law N° 001/2023 of 13/01/2023 governing national parks and nature reserves was enacted, providing updated legal authority for PA management, buffer zones and management planning. Ministerial Order N° 004/MOE/24 of 25/10/2024 provides a legal basis for private protected areas, while Ministerial Order N° 005/MOE/24 of 25/10/2024 establishes the size and management requirements for national park and nature reserve buffer zones.
Rwanda currently designates four protected areas covering approximately 232,000 ha (9.1% of national territory). When including OECMs such as community-managed remnant forests and managed wetlands, 47% of the national land area falls under some form of conservation designation. Three milestone international designations were secured: Nyungwe NP was inscribed as Rwanda's first UNESCO World Heritage Site in September 2023; Kigali received Ramsar Wetland City Accreditation in 2022, and Gishwati-Mukura was designated a UNESCO Biosphere Reserve in 2020. African Parks assumed co-management of Nyungwe NP with RDB in 2024.
Progress Assessment and Rating
Formal PA coverage stands at 9.1% against the NBSAP 2030 target of 11%, with pipeline expansion expected to close the majority of the 1.9 percentage point gap. When OECMs are included, 47% of national land falls under some form of conservation designation. KII dominant rating: 'On Track'.
Indicator / Outcomes | Value / Status | Source |
| GBF Headline Indicator A.1: Coverage of protected areas and OECMs | ||
Formal PA coverage (terrestrial) | 9.1% / ~232,000 ha | UNEP-WCMC, 2026 |
NBSAP PA target (2030) | 11% | Republic of Rwanda, 2025a |
Conservation landscape coverage (PAs + OECMs) | 47% of national land area | REMA, 2023b |
OECMs registered in WD-OECM database | 0 | - |
| International Designations | ||
Nyungwe UNESCO World Heritage Site | Inscribed September 2023 | IUCN, 2023b |
Kigali Ramsar Wetland City | Accredited 2022 | AllAfrica, 2022 |
Gishwati-Mukura UNESCO Biosphere Reserve | Designated 2020 | UNESCO, 2025 |
Challenges and Data Gaps
Formal PA coverage (9.1%) significantly lags behind the GBF 30x30 target. Rwanda has registered zero OECMs in the WD-OECM database despite community-managed wetlands and forest reserves that could qualify. Connectivity between PA units remains fragmented. METT assessments have not been systematically conducted across all sites.
No data
Rwanda's protected area network (9.1% formal coverage, 47% when OECMs are included) contributes to SDG 15.1 (conservation and sustainable use of terrestrial and freshwater ecosystems), SDG 15.4 (conservation of mountain ecosystems), and SDG 14.5 (conservation of at least 10 percent of coastal and marine areas - applied here to inland waters such as Lake Kivu). The three international designations secured during the reporting period - Nyungwe UNESCO World Heritage Site (2023), Gishwati-Mukura UNESCO Biosphere Reserve (2020), and Kigali Ramsar Wetland City Accreditation (2022) - embed Rwanda's PA system in globally recognized conservation frameworks.
Summary of Rwanda's Contribution to Goal A
Rwanda's national outcomes under T1-T8 contribute directly to the global ambition of GBF Goal A. The following national achievements constitute Rwanda's measurable contribution to this global goal.
Rwanda's contribution to GBF Goal A is anchored by three inter-connected national programs: forest landscape restoration (GBF AT2), protected area consolidation (GBF AT3), and flagship species recovery (GBF AT4). Rwanda's national forest cover of 30.4% of national territory and preservation and expansion of the natural forest component constitute the critical driver of Rwanda's contribution to GBF Goals A.1-A.3.
Rwanda's formal protected area network covers 9.11% of national territory across four national parks (Volcanoes, Nyungwe, Akagera, Gishwati-Mukura) and numerous gazetted wetlands and forest reserves. The additional gazettal of 35 priority swamplands (~2,000 ha) under Prime Minister's Order No. 001/03 of January 2024 represents the largest single-year expansion of the protected area network in recent decades. Including landscape conservation designations, approximately 47% of national territory falls under some form of conservation designation.
The most internationally recognized dimension of Rwanda's contribution to Goal A is the recovery of flagship megafauna. The mountain gorilla (Gorilla beringei beringei) was downlisted from Critically Endangered to Endangered by IUCN, with Rwanda's Volcanoes National Park hosting an estimated 250-260 of the over 1,100 known individuals globally. The lion population in Akagera National Park grew from 7 reintroduced individuals in 2015 to 62 by August 2025, while the rhinoceros population now exceeds 100 individuals following a June 2025 translocation of 70 additional white rhinos. The Grey Crowned Crane national population recovered from fewer than 500 individuals in 2017 to approximately 1,300 in 2025.

Figure 4: Rwanda Flagship Species Recovery (2015-2025)
These species recovery successes are exceptional by global standards, but they coexist with significant gaps: the national Red List Index (GBF indicator A.3) has not been computed nationally (except for amphibians); the Lantana camara invasion has expanded to cover up to 33% of Akagera National Park; and water quality in the Nyabarongo-Akagera river system is assessed as poor to moderately impaired across all sampled sites.
Key National Outcomes Achieved under Goal A
The table below summarizes how each national target's progress contributes to Goal A.
Table 1: Target-by-target contribution to GBF Goal A
| National Target | GBF AT | Key National Outcome (Section III) | Contribution to Goal |
|---|---|---|---|
| T1: Biodiversity-inclusive spatial planning | AT1 | NLUDMP 2020-2050 adopted; 30 DLUPs and 120 VLAPs operational; 0/30 DLUPs integrate KBAs | Establishes the spatial planning foundation for ecosystem integrity by directing land-use decisions toward biodiversity-compatible outcomes; absence of KBA integration limits contribution to connectivity and representativeness dimensions of Goal A |
| T2: Ecosystem restoration | AT2 | 332,861 ha under active restoration (55.5% of 600,000 ha target); six landscape-scale programs operational; flood-risk households reduced from 91% to 59% | Directly increases the area of natural ecosystems under restoration, contributing to Goal A's requirement that ecosystems be "restored"; delivers measurable resilience outcomes through NbS |
| T3: Protected areas | AT3 | 9.1% formal PA coverage (target: 11%); 47% including OECMs; three international designations (Nyungwe UNESCO WHS, Gishwati-Mukura UNESCO BR, Kigali Ramsar Wetland City); 35 priority swamplands gazetted (2024) | Advances Goal A by maintaining and enhancing ecologically representative conservation areas; 9.1% falls below the GBF 30x30 global target but Rwanda's 11% national target represents its intermediate milestone; pipeline expansion and OECM recognition could close the gap |
| T4: Species conservation | AT4 | Mountain gorilla: ~250-260 in VNP (global >1,100); lion: 62 in Akagera (up from 7 in 2015); rhino: >100 post-June 2025 translocation; grey crowned crane: ~1,300 (up from <500 in 2017); Hill's horseshoe bat rediscovered | Demonstrates that human-induced extinction of known threatened species is being halted for flagship species, directly contributing to Goal A's species recovery dimension; national Red List Index (A.3) not yet computed, limiting systematic verification |
| T5: Sustainable use of wild species | AT5 | National fish production recovered to 52,439 t (2024/25) from 32,756 t (2020); Lake Kivu capture declined 33% (2017–2020); no stock assessment since 2020; no national monitoring system | Weak contribution to Goal A: absence of sustainable harvest monitoring means it cannot be demonstrated that wild species abundance is being maintained at "healthy and resilient levels" |
| T6: Invasive alien species | AT6 | GRIIS Rwanda 2025 baseline: 262 species; Lantana camara control in Akagera NP (covers up to 33%); no NIASAP adopted | Partial contribution to ecosystem integrity: IAS control in 2/4 national parks protects ecosystem condition, but absence of a national IAS strategy limits systematic reduction of establishment rates required for Goal A resilience |
| T7: Pollution reduction | AT7 | Plastic bans enforced (2008, 2019); organic fertilizer 90.2% of farmers; 472.3 t expired agrochemicals awaiting disposal; TARISS score 44.53 ± 2.69 (moderate impairment); no national nutrient budget | Contributes to maintaining ecosystem condition by reducing plastic and chemical pollution; water quality in Nyabarongo-Akagera remains moderately impaired, and GBF indicators 7.1/7.2 cannot be computed, limiting verification |
| T8: Climate resilience / NbS | AT8 | Six NbS programmes (TREPA, Green Amayaga, VCRP, CND, FIP, Kigali wetlands); >395,000 ha NbS coverage; flood-protected households: 9% to 41% (exceeding 40% target); FONERWA USD 274M+ | Directly contributes to the "resilience" dimension of Goal A by building ecosystem-based climate adaptation across vulnerable landscapes; Rwanda's primary mechanism integrating biodiversity conservation with climate action |
Summary of Rwanda's Contribution to Goal B
Rwanda's contribution to GBF Goal B reflects nature-based livelihoods and tourism, generating substantial and well-documented socio-economic benefits. However, the sustainability of the underlying wild species base and ecosystem services is insufficiently monitored and, in some domains (fisheries), declining.
The Rwanda Tourism Revenue Sharing Program (TRSP) is a well-developed benefit-sharing mechanism. Rwanda directs 10% of all national park entrance fees directly to communities in Park Adjacent Administrative Sectors. In the 2023/2024 cycle, RWF 3.27 billion was disbursed across 105 community projects. Rwanda’s tourism sector generated USD 647 million in 2024, with nature-based tourism accounting for approximately 80% of leisure and conference visitors.
Sustainable agriculture is advancing through PSTA5 and the National Aquaculture Strategy. The national organic fertilizer use rate reached 90.2% of farmers in Season A 2026. ARCOS has planted 11.58 million perennial trees across 49,915 ha under 59 species (41 indigenous). Urban ecosystem services represent Rwanda's most emerging GBF Goal B contribution, with urban green space in Kigali estimated at 15-20% of urban land area and approximately 500 ha of additional urban wetlands under active rehabilitation in the 2025-2026 cycle.
Key National Outcomes Achieved under Goal B
The table below summarizes how each national target's progress contributes to Goal B.
Table 2: Target-by-target contribution to GBF Goal B
| National Target | GBF AT | Key National Outcome (Section III) | Contribution to Goal |
|---|---|---|---|
| T9: Sustainable use and community benefits | AT9 | TRS: RWF 3.27B to 105 community projects (2023/24); gorilla tourism >USD 200M (2024); total tourism revenue USD 647M; ~160,000 tourism jobs; no benefit-tracking system beyond TRS | Demonstrates that nature's contributions to people can be maintained and enhanced through wildlife-based tourism and revenue-sharing, directly contributing to Goal B; absence of a benefit-tracking system outside TRS means full scope of biodiversity-based livelihoods is not captured |
| T10: Sustainable agriculture, forestry & fisheries | AT10 | Organic fertilizer: 90.2% of farmers; forest cover 30.4%; 1,642 PGRFA at national genebank; National Aquaculture Strategy adopted (80,000 t/year by 2035); ARCOS: 11.58M trees planted, 80,000 households, 49,915 ha | Directly contributes to Goal B's "sustainably used and managed" dimension by integrating biodiversity into agricultural, forestry, and fisheries management at national scale; maintenance of 30.4% forest cover alongside agricultural productivity demonstrates sustainable use, and ecosystem integrity can coexist |
| T11: Ecosystem services & NCP | AT11 | Nyungwe NP ecosystem services valued at USD 4.8B; Kigali wetlands USD 74.2M+/year; SEEA-EA pilots under development; soil erosion reduced from 150 to 25 t/ha/yr on treated catchments | Advances Goal B's requirement that nature's contributions be "valued" through site-level ecosystem service valuations and SEEA piloting; demonstrates NbS can restore ecosystem functions currently in decline; no national SEEA-EA synthesis published yet |
| T12: Urban green and blue spaces | AT12 | Nyandungu Eco-Park: 121 ha, 72+ plant species, 200+ bird species, ~6,000 visitors/month; Green City Kigali Master Plan (600 ha) approved September 2024; ~500 ha urban wetlands under rehabilitation | Contributes to the urban dimension of Goal B by demonstrating that ecosystem functions and services in urban areas can be maintained and enhanced; Nyandungu provides measurable recreation, flood regulation, and biodiversity benefits; measurement does not yet extend beyond Kigali |
No national ecosystem-services index produced. Site-level valuations: Nyungwe NP USD 4.8 billion (2020); Rugezi wetland USD 374 million (2014); Mukura landscape USD 1,443/yr (2014); Akagera Wetland Complex — carbon stock USD 1.1 billion / annual flow USD 11.9 million (2019); Kigali wetlands >USD 74.2 million/year provisioning (ARCOS, 2021a,b). SEEA pilot completed 2023 (World Bank/NISR) but no national SEEA-EA synthesis published.
Summary of Rwanda's Contribution to Goal C
CRITICAL GAP TARGET: T13 (ABS) was identified as a gap target in the 2016-2020 NBSAP cycle and remains critically off-track. Rwanda has established legal and institutional foundations for the Nagoya Protocol, including formal ratification in 2012 and REMA’s designation as the national focal point, but no dedicated national ABS law has been enacted and no ABS permits have been issued and registered in the ABS Clearing-House.
This means that Rwanda cannot report any monetary (GBF C.1) or non-monetary (GBF C.2) ABS benefits, cannot demonstrate compliance monitoring through checkpoint communiques, and has not operationalized the DSI governance framework required under the Cali Fund established at COP-16. Without operationalized ABS permitting and a dedicated domestic ABS law, Rwanda's international obligation under the Nagoya Protocol is structurally unmet.
Key National Outcomes Achieved under Goal C
The table below presents the single national target's contribution to Goal C.
Table 9: Target-by-target contribution to GBF Goal C
| National Target | GBF AT | Key National Outcome (Section III) | Contribution to Goal |
|---|---|---|---|
| T13: Access and Benefit-Sharing | AT13 | Nagoya Protocol ratified (2012); Law N° 064/2021 provides general ABS legal basis; 0 IRCCs registered; 0 ABS permits issued; no dedicated ABS law; National Genebank: 1,642 PGRFA accessions; TK documentation initiated by Rwanda Cultural Heritage Academy | Structurally limited contribution to Goal C: legal and institutional foundations for ABS exist (Nagoya ratification, REMA as focal point), but absence of a dedicated domestic ABS law, a permit system, and user checkpoints means no monetary or non-monetary benefits have been captured through internationally agreed ABS instruments; Rwanda cannot demonstrate progress toward "substantially increased" benefit-sharing |
Summary of Rwanda's Contribution to Goal D
Rwanda is taking active and, in several domains, globally notable steps to strengthen the means of implementation for the NBSAP and GBF. The most consequential actions in the 2020-2026 period are: (i) the mobilization of approximately USD 274 million through FONERWA by 2024 against a national biodiversity target of USD 500 million by 2030; (ii) the enactment of Biosafety Law No. 025/2024, converting what was a gap target into a substantive legislative achievement; (iii) the establishment of the Rwanda Biodiversity Information System (RBIS); and (iv) an internationally recognized gender equality foundation, with 63.8% women in Rwanda's Chamber of Deputies.
On the legislative front, the promulgation of Law No. 025/2024 represents the most significant single legislative advance among Rwanda's former gap targets in this reporting cycle. Biodiversity mainstreaming has similarly advanced at the policy level, with biodiversity integrated into Vision 2050, NST2 (2024-2029), GGCRS (2023), PSTA5, the National Land Use Master Plan (2020-2050), and mandatory EIA/ESIA requirements.
Key National Outcomes Achieved under Goal D
The table below summarizes how each national target's progress contributes to Goal D.
Table 10: Target-by-target contribution to GBF Goal D
| National Target | GBF AT | Key National Outcome (Section III) | Contribution to Goal |
|---|---|---|---|
| T14: Mainstreaming | AT14 | Biodiversity in Vision 2050, NST2, PSTA5, Law N° 064/2021; EIA guidelines revised; 149 EIA experts + 63 biodiversity actors trained; SEEA pilots (2023); no cross-sector monitoring system | Contributes to Goal D by establishing the policy architecture for biodiversity mainstreaming across sectors; absence of a monitoring system to track mainstreaming effectiveness means Rwanda cannot verify whether policy integration is translating into biodiversity outcomes |
| T15: Business disclosure | AT15 | BNR Guidelines No. 040/2024 and No. 2600/2023 issued; BIOFIN TNFD-alignment assessment completed; 0 companies with biodiversity-specific reports; no mandatory disclosure framework | Early-stage contribution to Goal D's financial alignment dimension: Rwanda has established the regulatory preconditions for corporate biodiversity disclosure, but no company has yet published a biodiversity-specific risk report |
| T16: Sustainable consumption and production | AT16 | Plastic bans enforced (2008, 2019); Circular Economy Action Plan launched (2022); food waste index: Kigali 164 kg/capita/yr; ecological footprint 0.55 gha; no national food waste reduction target; no material footprint baseline | Limited contribution to Goal D: while plastic bans represent a globally notable SCP achievement, absence of national consumption baselines (material footprint, food waste reduction targets) prevents Rwanda from demonstrating systemic progress toward aligning consumption patterns with biodiversity |
| T17: Biosafety | AT17 | Biosafety Law No. 025/2024 enacted; National Biosafety Committee operational; IBCs at RAB, UR, RICA; confined GMO field trials ongoing; monitoring system not yet fully operational | Significant contribution to Goal D: enactment of comprehensive biosafety legislation represents the most substantive legislative achievement among Rwanda's former gap targets, directly securing a means of implementation for safe use of biotechnology |
| T18: Harmful incentives | AT18 | BIOFIN identified CIP fertilizer subsidy for rice (RWF 54.2B) as harmful to wetland biodiversity; TRS RWF 3.27B (positive incentive); PES pilots; IremboPay USD 130,000+; GBF D.2 = zero (no harmful subsidy reformed) | No contribution to Goal D's financial alignment dimension on the reform side: no harmful subsidy has been reformed despite identification; positive incentives (TRS, PES) are operational but do not offset the structural deficit of unaddressed harmful incentives |
| T19: Biodiversity finance | AT19 | FONERWA ~USD 274M cumulative; CNFS 2024–2030 launched; GCF direct access; Ireme Invest; NBSAP target: USD 500M by 2030; no biodiversity budget tag in IFMIS; biodiversity-specific finance not disaggregated | Partial contribution to Goal D's financial resource dimension: substantial green finance has been mobilized, but absence of biodiversity-specific tagging means Rwanda cannot demonstrate how much of this finance is aligned with the KM-GBF; the biodiversity finance gap remains unquantifiable |
| T20: Capacity building | AT20 | 3,000+ participants trained (2024/25) in biodiversity monitoring; Nature Rwanda: 2,920 direct + 30,000+ awareness; 175 ESIA practitioners trained; CoEB/UR research outputs; no centralized tracking database | Contributes to Goal D's capacity-building dimension with documented training activity at significant scale; absence of a centralized database prevents consolidation into a verifiable national indicator |
| T21: Biodiversity data | AT21 | RBIS operational: 2,976 species, 145,887 occurrence records, 127 endemic, 89 threatened; 2 GBIF datasets; CBD CHM functional; institutional upload rates low; ESD mainstreamed in curriculum | Contributes to Goal D's technology access and scientific cooperation dimension through an operational national biodiversity information system; low institutional upload rates and weak interoperability limit the system's effectiveness as a means of implementation |
| T22: Inclusive governance | AT22 | 63.8% women in parliament; RWB engagement: 11,550 women, 15,240 youth, 502 PWD; RYBN established; ESIA public consultation ~100%; TK not yet incorporated in RBIS | Contributes to Goal D's equitable access dimension through Rwanda's globally leading gender representation and documented inclusive participation in conservation programs; biodiversity-specific participation indicators are not yet standardized |
No standalone biodiversity budget line or COFOG-style biodiversity expenditure tracking exists. FONERWA cumulative mobilization ~USD 274 million (2012-2024) covers climate and environment broadly — not biodiversity-specific and is a cumulative total, not an annual series. Biodiversity-specific expenditure not tagged in the national budget (BIOFIN Rwanda, 2025b). Ireme Invest concessional credit: 12% rate (BRD, 2025).
Growing private finance activity via FONERWA co-financing and IREME Invest (BRD) but not disaggregated into a biodiversity-specific private-funding figure. No national system tracks private biodiversity finance.
Rwanda's 22 NBSAP national targets, three (T3, T10, T12) are rated On Track by the documentary assessment; thirteen are rated Progress but Insufficient; and six (T5, T9, T13, T16, T18, T19) are rated No Significant Progress. No target falls into the Insufficient Data category, reflecting the progress made in biodiversity information systems. At the GBF Goal level, Goals A, B, and D are assessed as Progress but Insufficient; Goal C (Access and Benefit-Sharing) registers No Significant Progress.
Table 1: Performance summary
Domain (Dec. 15/8) | Individual Level | Institutional Level | Systemic / Enabling Environment |
|---|---|---|---|
On Track | 3 | T3, T10, T12 | Pipeline-dependent (T3); pilot-scale CA gap (T10); no City Biodiversity Index (T12) |
Progress but Insufficient | 13 | T1, T2, T4, T6, T7, T8, T11, T14, T15, T17, T20, T21, T22 | Monitoring baseline gaps; fragmented data; funding shortfalls |
No Significant Progress | 6 | T5, T9, T13, T16, T18, T19 | Legislative gap (T13); tracking system absent (T19); subsidy reform unstarted (T18) |
Five of the six No Significant Progress targets (T5, T13, T16, T18, T19) were already flagged as gap targets carried forward from the 2016-2020 NBSAP cycle. Their continued underperformance represents a structural, cross-cycle deficit that demands a qualitatively different response: legislative action, specified financing mechanisms, and dedicated institutional mandates.
Rwanda's biodiversity record over the 2020-2026 reporting period reflects a range of achievements that are, in several domains, globally significant.
E.2.1 Goal A: Ecosystem Integrity and Species Recovery
National forest cover has been sustained at 30.4% of national territory. Six landscape-scale restoration programs are simultaneously operational; 332,861 ha are under active restoration against a 600,000 ha target. TREPA-specific annual data: 16,737 ha restored in 2023, 27,063 ha in 2024, and 21,660 ha in 2025. The proportion of households protected from flood risk rose from 9% to 41% by 2026, exceeding the NBSAP interim target of 40% four years ahead of schedule. Three landmark international designations were secured within the reporting period: Nyungwe NP as Rwanda's first UNESCO World Heritage Site (2023); Gishwati-Mukura as a UNESCO Biosphere Reserve (2020); and Kigali as a Ramsar Wetland City (2022). Including OECMs, 47% of national land falls under some form of conservation designation. Species recovery is exceptional by regional standards, including mountain gorilla, grey crowned cranes and rhinoceros.
E.2.2 Goal B: Sustainable Use and Ecosystem Services
Tourism Revenue Sharing disbursed RWF 3.27 billion to 105 community projects in FY 2023/2024, with cumulative distributions since 2005 exceeding RWF 18 billion. Total tourism revenues reached USD 647 million in 2024. Organic fertilizer use reached 90.2% of farmers in Season A 2026. Small-scale food producers now earn an average of RWF 609,257 annually (TREPA Annual Household Survey 2025), with ARCOS data showing 80,000 households engaged and 11.58 million perennial trees planted across 49,915 ha. The Nyandungu Urban Wetland Eco-Park (121 ha) is fully operational, and an additional ~500 ha of urban wetlands are under active rehabilitation in 2025-2026.
E.2.3 Goal C: Access and Benefit-Sharing
Goal C is the weakest-performing of the four GBF Goals, and no substantive achievements can be reported under the headline GBF indicators for this reporting period. Zero Internationally Recognized Certificates of Compliance have been published in the ABS Clearing-House since Nagoya Protocol ratification in 2012, and no monetary or non-monetary benefits from genetic resource utilization have been formally quantified. Two positive steps are nonetheless worth noting: Rwanda maintains the National Genebank conserving 1,642 plant genetic resource accessions under the ITPGRFA Multilateral System; and the Rwanda Cultural Heritage Academy has initiated documentation of traditional knowledge associated with medicinal plants.
E.2.4 Goal D: Means of Implementation
Biosafety Law No. 025/2024 was enacted, converting a persistent gap target into a substantive legislative achievement. The National Climate and Nature Finance Strategy (CNFS) 2024-2030 was launched by MINECOFIN in October 2024. FONERWA mobilized approximately USD 274 million in cumulative green finance. RBIS holds records for 2,976 species with 145,887 occurrence records.
The KII survey provides systematic evidence on structural challenges and barriers.
E.3.1 Biodiversity Finance Tracking Deficit
There is limited disaggregation of biodiversity-specific expenditure from either the national budget or the FONERWA portfolio. MINECOFIN's Climate Budget Tagging system classifies spending under climate adaptation, mitigation, and a broad 'environment' category, with biodiversity not being a discrete tag. The establishment of new instruments including the Intego Fund with a dedicated biodiversity call represents operational progress that current tracking systems cannot capture for GBF reporting purposes.
E.3.2 Absent or Incomplete Monitoring Baselines
For nine targets (T4, T5, T6, T7, T14, T15, T16, T19, T20), Section III explicitly flags that the GBF headline indicator lacks national data, and assessments rely on proxy indicators, partial data, or qualitative judgment. T19 is the only target where a composite progress percentage cannot be calculated, due to the absence of a biodiversity finance tagging system.
E.3.3 Data Fragmentation and Institutional Siloing
Data fragmentation remained the most frequently cited challenge across the survey (37.7% prevalence). The survey consistently identified the absence of interoperability between national biodiversity data platforms and the lack of a central data repository as the primary technical barriers. For T9, the core deficit is the absence of a consolidated national benefit-sharing monitoring framework. For T10, sectoral production and agriculture data exist across multiple institutions but are not aggregated into a unified national sustainability assessment.
E.3.4 Legislative and Operational Gaps
Three critical legislative gaps persist. First, no dedicated national ABS law has been enacted despite Nagoya Protocol ratification in 2012. Second, no National Invasive Alien Species Action Plan has been adopted despite 262 recorded invasive species. Third, the consolidated National Biodiversity Policy 2026 remains pending cabinet endorsement.
E.3.5 Wild Species Monitoring and Enforcement
Despite MINAGRI’s annual biological break in Lake Kivu fisheries and over 13,000 snares removed from Nyungwe NP since 2016, wild capture fisheries production from Lake Kivu declined 33% between 2017 and 2020 with no stock assessment conducted since 2020, though national total fish production has since recovered to 52,439 t in 2024/25.
CBD Decision 15/8 identifies three nested levels at which capacity must be assessed: (i) individual capacity: skills, knowledge, and competencies of practitioners; (ii) institutional capacity: systems, mandates, resources, and coordination; and (iii) systemic/enabling environment capacity: policy, legal, regulatory, and financial frameworks. The analysis below maps Rwanda's documented capacity deficits across the six thematic domains of Decision 15/8.
Table 2: Capacity gaps mapped to CBD Decision 15/8 three-level framework
No. | Recommendation | Target / GBF AT | Responsible | Timeline |
|---|---|---|---|---|
R1 | Endorse the National Biodiversity Policy 2026 consolidating the Wildlife Policy 2011 and Biodiversity Policy 2013, establishing the overarching legal anchor for cross-sector biodiversity accountability. | T14, T5, T18 / AT14 | Lead: MoE; Support: REMA | 2026 |
R2 | Introduce a biodiversity-specific budget tag within MINECOFIN's existing CBT/IFMIS system, adding a discrete biodiversity classification at activity level and establishing an annual biodiversity expenditure report. | T19 / AT19 GBF D.2 | Lead: MINECOFIN; Support: MoE, REMA, FONERWA | 2026 |
R3 | Enact a standalone National ABS Law establishing a permit system, mandatory user checkpoints, monetary and non-monetary benefit-sharing obligations, and DSI governance provisions consistent with the Cali Fund. Register Rwanda's first IRCCs before CBD COP-17 (October 2026). | T13 / AT13 GBF C.1, C.2 | Lead: REMA; Support: RICA, RAB, RDB, MoE | 2026 |
R4 | Commission a comprehensive fish stock assessment for Rwanda's major inland water bodies and establish a biannual assessment cycle under RAB/MINAGRI coordination. | T5, T10 / AT10 GBF B.4 | Lead: MINAGRI, RAB; Support: REMA, RDB, CoEB/UR | 2026-2027 |
R5 | Adopt a National Invasive Alien Species Action Plan (NIASAP), prioritizing Lantana camara in Akagera and Eichhornia crassipes in aquatic ecosystems, and establishing an early-detection and rapid-response protocol integrated with RBIS. | T6 / AT6 GBF A.6 | Lead: REMA; Support: RDB, RFA, MINAGRI, African Parks | 2026-2027 |
R6 | Commission national IUCN Red List assessments and establish at least a 4-5 year national Red List update cycle. | T4 / AT4 GBF A.3 | Lead: REMA, CoEB/UR; Support: IUCN, RDB | 2026-2027 |
R7 | Integrate Key Biodiversity Area (KBA) spatial data layers into District Land Use Plans and set a KBA-integration standard for all subsequent DLUP revisions. | T1, T3 / AT1 GBF A.1 | Lead: NLA; Support: REMA, RDB, CoEB/UR, MoE | 2027 |
R8 | Establish a cross-sectoral biodiversity mainstreaming monitoring framework, embedding biodiversity outcome KPIs into annual Joint Sector Reviews of agriculture, forestry, water, tourism, and infrastructure, linked to NST2 reporting. | T14 / AT14 GBF D.1 | Lead: REMA, MINECOFIN; Support: MINAGRI, RFA, RWB, RDB, MININFRA | 2027 |
R9 | Launch a Natural Capital Accounting (SEEA-EA) program covering the Nyungwe-Rugezi-Nyabarongo ecological corridor, building on the 2023 NISR/World Bank pilot. | T11 / AT11 GBF B.1 | Lead: NISR, REMA; Support: World Bank, UNDP, CoEB/UR | 2027-2028 |
R10 | Implement BIOFIN 2025 recommendations to redesign the CIP fertilizer subsidy for rice (RWF 54.2 billion, identified as harmful to wetland biodiversity), and register Community OECMs in the WD-OECM database. | T18, T3 / AT18, AT3 GBF D.2, A.1 | Lead (subsidy): MINAGRI, MINECOFIN; Lead (OECM): RDB, NLA | 2027 |
Rwanda's implementation of the Convention on Biological Diversity and the Kunming-Montreal Global Biodiversity Framework during the 2020-2026 reporting period has been materially enabled by international financial and technical support from multilateral and bilateral partners.
Green Climate Fund (GCF). Four GCF-financed projects active in the reporting period deliver biodiversity-relevant nature-based solutions outcomes: TREPA (FP, USD 33.7 million grant plus USD 15.8 million co-financing, approved 2021, implemented by IUCN with RFA); the Congo-Nile Divide Restoration Project (FP217, USD 39.1 million, approved October 2023, implemented by the Ministry of Environment); Green City Kigali (FP245, USD 28 million, approved October 2024, implemented by FONERWA); and Rwanda Green Investment Facility / Ireme Invest additional tranche (FP221, USD 42.8 million, approved October 2023, via the African Development Bank). Total confirmed GCF commitments to biodiversity-relevant NbS during this period amount to approximately USD 143.7 million. An earlier GCF direct-access project (Green Gicumbi, FP073, USD 32.8 million) supported catchment and watershed restoration in Northern Rwanda under FONERWA implementation.
Global Environment Facility (GEF). The GEF/LDCF-funded Green Amayaga Phase I (USD 32.7 million, implemented by UNDP with REMA). A GEF-8 grant of USD 9 million (2025) supports ecosystem restoration in the Nyungwe-Ruhango Corridor, implemented by the World Bank and Conservation International. GEF has additionally supported establishment of RBIS and biodiversity monitoring capacity through earlier programming cycles.
UNDP - Biodiversity Finance Initiative (BIOFIN). BIOFIN delivered: (1) a national biodiversity expenditure review and financial needs assessment; (2) a policy brief identifying the CIP fertilizer subsidy for rice as harmful to wetland biodiversity and recommending its redesign; and (3) a policy brief assessing Rwanda's readiness for nature-related financial disclosures (TNFD alignment). These outputs directly inform Targets 18, 19 and 15 of the NBSAP 2025-2030.
World Bank. The Volcanoes Community Resilience Project (VCRP) was approved by the World Bank Board on 2 October 2023 with USD 50 million IDA financing plus a USD 12 million PROGREEN Multi-Donor Trust Fund co-financing grant. The World Bank is also preparing a Rwanda Wildlife Conservation Bond (P505213) to protect chimpanzee populations and restore ecosystems in Nyungwe and Gishwati-Mukura National Parks. The World Bank, through the WAVES Global Partnership, has supported Rwanda's System of Environmental-Economic Accounting (SEEA) and natural capital accounting work since 2014.
Bilateral donors. SIDA is the primary funder of COMBIO, which promotes community-based biodiversity restoration in Eastern Rwanda. The German Development Bank (KfW), under the Rwandan German Climate and Development Partnership (total portfolio exceeding EUR 260 million), financed Green City Kigali (EUR 30 million) and the NDC Facility at the Rwanda Green Fund (EUR 26 million). The Nordic Development Fund (NDF) co-financed the Kigali Flood Control and Integrated Urban Catchment Management Project. AFD provided a EUR 20 million credit facility plus EUR 1 million for Ireme Invest, and EUR 50 million in green public financial management budget support. The EU-funded DeSIRA Agroforestry Rwanda project, implemented by IUCN, Enabel and CIFOR-ICRAF in partnership with the University of Rwanda, Ghent University and KU Leuven, supports biodiversity-relevant agroforestry research.
The following ten recommendations are derived from the convergent evidence of the documentary assessment, KII survey, and capacity gap analysis. They are ordered by urgency and structural significance.
Table 3: Priority recommendations
Domain (Dec. 15/8) | Individual Level | Institutional Level | Systemic / Enabling Environment |
|---|---|---|---|
Monitoring & Assessment | Limited national taxonomists; no certified freshwater bioassessment specialists. | RBIS under-populated; no central data repository; FMES and RBIS not interoperable. | No legal mandate for routine national Red List updates; GBF headline indicators A.3, B.1, C.2, C.3 not reportable. |
Policy Integration & Mainstreaming | Sectoral officers lack biodiversity outcome monitoring skills; EIA reviewers trained on screening but not post-approval monitoring. | No standardized cross-sectoral biodiversity monitoring framework; SEEA accounts not operationalized; KBA geodata layers absent from DLUPs. | National Biodiversity Policy 2026 pending endorsement; No inter-ministerial coordination mechanism with binding biodiversity reporting obligations. |
Resource Mobilization & Finance | No certified biodiversity finance accounting practitioners at MINECOFIN. | Limited disaggregation of biodiversity from climate spending; establishment of a biodiversity expenditure tagging protocol within the existing CBT/IFMIS system needed. | No biodiversity-specific budget line in IFMIS; GBF D.2 indicator at zero. |
Access & Benefit-Sharing | Lack of specialized ABS negotiation and Nagoya Protocol permitting expertise. | No dedicated ABS permitting unit; RICA export permits not integrated with Nagoya Protocol checkpoints; zero IRCCs in ABS Clearing-House. | No standalone national ABS law; no domestic DSI governance provisions consistent with Cali Fund (CBD Decision 16/6). |
Technology & Knowledge Management | Insufficient access to updated tools and fully functional biodiversity databases. | RBIS not interoperable with MINAGRI, RFA, or GBIF feeds; no natural capital accounting platform; TK not in any information system. | Lack of national biodiversity informatics strategy; technology transfer through international cooperation not systematically captured. |
Communication, Education & Awareness | Extension staff and tourism operators not systematically trained on biodiversity messaging. | No national biodiversity communications strategy; City Biodiversity Index not operational; no harmonized urban green space measurement beyond Kigali. | ESD integrated in national curriculum but biodiversity-specific learning outcomes not assessed; RYBN established but under-resourced. |
Rwanda's Seventh National Report presents a comprehensive assessment of national biodiversity governance performance over the 2020-2026 reporting period against the 22 national NBSAP targets and the four Goals of the Kunming-Montreal Global Biodiversity Framework.
The documented record reflects substantive and, in several domains, measurable advances in implementation. The progressive integration of biodiversity into national development planning constitutes an institutional and financial architecture of considerable depth. Three international designations secured within the reporting period, Nyungwe National Park as Rwanda's first UNESCO World Heritage Site, Gishwati-Mukura as a UNESCO Biosphere Reserve, and Kigali as a Ramsar Wetland City, represent durable conservation anchors with legal and reputational weight that will bear on future land-use decisions affecting Rwanda's most ecologically significant landscapes.
Ecological outcomes over the reporting period are substantive, and the outcomes confirm Rwanda’s capacity to meet ambitious national biodiversity targets where legal mandates, institutional ownership, and financing are adequately aligned.
The persistence of six targets at No Significant Progress, and structural deficits in biodiversity finance tracking, ABS operationalization, baseline monitoring, and cross-sectoral accountability, indicate that the institutional transitions required for full NBSAP delivery by 2030 have not yet been completed. Five of the six underperforming targets, T5, T13, T16, T18, and T19, were carried forward as gap targets from the 2016-2020 NBSAP cycle. Their continued stagnation is principally a legislative and institutional design deficit rather than a resource or program delivery failure. The ten priority recommendations to address persistent challenges are calibrated to the specific architecture of Rwanda's biodiversity governance system and are traceable, individually, to documented legislative, monitoring, or financing deficits.
Rwanda enters the second half of the GBF implementation decade with established operational delivery systems, and a governance record that includes tangible progress across the majority of the NBSAP target portfolio. The central challenge of the period to 2030 is monitoring transitions that will bring Rwanda's formal biodiversity governance framework into correspondence with the scale and quality of the conservation investments already being made. The political decisions required to achieve that transition are specific, documented, affordable, and available for action within the current national planning cycle.